4
Start-up, maintenance, and diagnostics
2 Precautions
Instruction book, IQAN- G2
Before you start,
Read section "Start-up", on page 18.
Additional information for service
Mounting and maintenance instruction book.
Additional information for diagnosing the system
For information, see Appendix B, on page 21, in this document.
N
OTICE
It is required to download the operating system 2.60 or later to enable full functionality
of the modem in IQANdesign platform systems.
N
OTICE
The IQAN-G2 functionality requires the following:
•
a SIM card from your preferred Network operator.
•
A subscription to a server solution that is offered by a Parker supplier. Contact your
local Parker Sales office for additional information.