
Parker Hannifin Corporation
Chelsea Products Division
Olive Branch, MS 38654 USA
Cable Control Installation Instructions (Continued)
(Reversibles, dual shift units, and some gear boxes)
1. Use steps #1-#5 from previous
instructions.
2. In step #6 the cable can come from
either direction since the P.T.O. will
always be engaged when all the way
in or out.
3. Follow step #7 and #8.
4. In step #9 shift the P.T.O. from
forward to reverse or vice versa
to determine the amount of travel
needed and the length of casing
to be cut.
5. Follow step #10-#14.
6. Step #15 will show the following:
CABLE IN: P.T.O. ENGAGED: LIGHT ON
CABLE OUT (1st position):
P.T.O. DISENGAGED: LIGHT OUT
CABLE OUT (2nd position):
P.T.O. ENGAGED: LIGHT ON
Bulletin HY25-1396-M1/US
Wire Shift P.T.O.’s*
Owner’s Manual
Counter Shaft & Thrushaft
53