Bulletin HY25-1806-M1/US
Owner’s Manual
252 Series
Parker Hannifin Corporation
Chelsea Products Division
Olive Branch, MS 38654 USA
26
Dodge/Sterling/Ram Installation
Pre Installation Overview
Fig. 28
Fig. 29
Fig. 30
Fig. 31
The current Power Take-Off (PTO) installation is from
under the vehicle, an alternative method for Dodge has
been developed with the help of Chelsea Products that
allows the installation from above by removing the PTO
patch panel in the floor.
The installation instructions below are shown using a
Dodge 4500 crew cab for installation, but applies to all
Dodge work trucks. See Dodge upfitter web site for any
changes to this installation information.
1. Unbolt the seat and move it to the rear of the cabin.
(
Fig. 28)
2. Remove the sill guards (rocker panel covers)
passenger side to allow the floor mat to be lifted.
They are removed by prying straight up to disengage
metal clips. (
Fig. 29)
3. Lift the floor mat and fold it rearward and towards the
driver side to expose the patch panel (
Fig. 30)
4. Remove the fasteners and sealer from around the
patch panel. Cut away the sound deadener pad to
expose the transmission PTO access. (
Fig. 31)
5. See installation of the PTO for complete PTO
installation instructions on
manual.
6. To assemble, reverse the above procedure (1-4)
using RTV to reseal the PTO floor pan patch panel.
Summary of Contents for 252 Series
Page 4: ...Parker Hannifin Corporation Chelsea Products Division Olive Branch MS 38654 USA IV...
Page 11: ...Parker Hannifin Corporation Chelsea Products Division Olive Branch MS 38654 USA 7 ALLISON...
Page 22: ...Notes Parker Hannifin Corporation Chelsea Products Division Olive Branch MS 38654 USA 18...
Page 23: ...Parker Hannifin Corporation Chelsea Products Division Olive Branch MS 38654 USA 19 DODGE RAM...
Page 42: ...Notes Parker Hannifin Corporation Chelsea Products Division Olive Branch MS 38654 USA 38...