d. If ferrule(s) (2) were removed from hose (3),
screw ferrule(s) fully into hose (left hand thread)
and then back off approximately one turn.
Screw oiler housing fully into one ferrule (right
hand thread) and connector (1) into the other
ferrule. Apply pipe thread sealing tape (Teflon)
onto the connector screw threads and then
screw the connector onto the Pakhammer
handle. Torque connector to 25 foot-pounds (34
N·m).
e. Fill oiler housing ½ full of Marvel ®, Air Tool Oil,
Turtle Wax, P.O. Box 247, Westmont, IL 60559
(Paratech PN 550291). To assure proper fill
level, hold the oiler horizontal with the fill hole
to the side (3 or 9 o’clock position). Fill until oil
just comes out of the fill hole and firmly install
the fill set screw.
Figure 6-2. Oiler and Hose Assembly, Exploded View
6-7/(6-8 blank)