Step 1:
Lay one of the axle frames upside
down on the floor.
Step 2:
Lay two of the frame tubes on the
axle frame as shown. Be sure that
pivot ears are verticle.
Step 3:
Position the frame tubes on the axle
frame so that the frame tube end
plates are up against the U-bolt
plates as shown.
Step 4:
Insert U-bolts and secure with
washers and nuts. Be sure U-bolts
are aligned square to the frame
tubes at the indicator marks as the
nuts are tightened.
Step 5:
Connect the second set of frame tubes
to the first set using two 3/4” x 2” bolts
and lock nuts (finger tight only). Be sure
“marked” surfaces of the pivot ears face
and touch each other. This will center
the connection of the offset pivot ears
and keep the frame tubes parallel.
COMPLETED
RIGHT
WRONG
ASSEMBLY INSTRUCTIONS
Note: Assembly sequence requires lifting and positioning heavy components.
Procedure may require two people.