background image

 22

3. Verify that data is passing between DBMs by selecting a backup link.

Main Menu

Status

Performance Statistics

Frame Relay

If data is being passed, Frames/Characters Sent and Received (Frame Relay Link)
and Status Msg Received (Frame Relay LMI) increment each time the screen is
Refreshed.

A PVC Connectivity test can also be run if the ISDN DLCI is multiplexed.

Main Menu

Test

ISDN PVC Tests

[DLCI Number]

Connectivity

Start

See 

Verifying Backup Setup in Setup of the User’s Guide for additional information.

Check the DSX Connection

1. Check the DSX LEDs. Is the Sig (DSX-1 signal) LED on, and are the DSX-1 OOF

(out of frame) and ALM (alarm) LEDs off?

– If yes, the DSX interface is set up correctly and ready to communicate.

– If no, check that both ends of the DSX cable are properly seated and secured.

When OOF is on, match the Line Framing Format and Line Coding Format
options to the network provider’s settings.

When ALM is on, contact the service provider.

2. Check Health and Status messages in the left column of the System and Test

Status screen to verify that there are no DSX-1 Health and Status messages.

Main Menu

Status

System and Test Status

If any DSX-1 messages appear, refer to the status information in 

Displaying

System Information of the User’s Guide.

In the User’s Guide, see 

Displaying System Information for additional status

information, and 

Troubleshooting for additional troubleshooting information.

Check the DTE Connection

1. Check that the port OK LED is on?

– If yes, the port is ready to communicate.
– If no, check that both ends of the V.35 cable are properly seated and secured.

2. Check Health and Status messages in the left column of the System and Test

Status screen for messages.

Main Menu

Status

System and Test Status

– If 

System Operational

 appears, the Port-1 interface is set up correctly and

is operational.

– If 

System Operational

 does not appear, refer to the status information in

Displaying System Information of the User’s Guide.

NOTE:

When any error conditions are detected, a status message will appear at the
bottom right corner of the screen.

Summary of Contents for FrameSaver SLV

Page 1: ...ical Manuals FrameSaver Frame Relay Devices Select the following document 9128 A2 GB20 FrameSaver SLV 9126 9128 User s Guide To request a paper copy of a Paradyne document Within the U S A call 1 800...

Page 2: ...28 A2 GL10 Visit the Paradyne World Wide Web site at www paradyne com to register your warranty Select Service Support Warranty Registration Safety Instructions Please refer to the EMI Warnings and Im...

Page 3: ...ectly behind the NAM that it supports in the access carrier 1 Remove the I O card from the shipping box To avoid damaging the card handle by the top and bottom edges only 2 At the rear of the carrier...

Page 4: ...the top and bottom edges to avoid damaging the card 2 At the front of the carrier align the NAM with the upper and lower tracks of the appropriate slot 3 Slide the NAM into the tracks until it seats...

Page 5: ...to 1 Flow Control is set to None 2 Insert the 8 pin end of the cable into the COM port for the appropriate slot 3 Insert the other end of the cable into the VT100 compatible asynchronous terminal PC...

Page 6: ...arrow key twice so the cursor is on Configuration 2 Press Enter to display the Configuration menu The Load Configuration From menu appears 3 Press Enter to select Current Configuration The cursor is a...

Page 7: ...installation time will be increased Verifying that Self Test Passed Before starting to configure the FrameSaver unit confirm that the unit passed the self test 1 Follow this menu selection sequence f...

Page 8: ...tic Frame Relay Discovery Configuration Set up Automatic Backup Configuration if an ISDN DBM if installed Setting the System Clock To set up the system clock 1 Select Date Time Main Menu Control Date...

Page 9: ...nually configured Use the following procedure if additional network time slots need to be cross connected to the DSX 1 interface See Assigning Time Slots in Configuration Options of the User s Guide t...

Page 10: ...ssary 8 Save the configuration Setting Up the Modem FrameSaver 9126 and 9128 units have an integral modem for remote management It is already set up for dial in access to the unit with Port Use set to...

Page 11: ...se dialing unless B specified T for tone dialing unless B specified Space underscore _ comma for a 2 second pause and dash readability characters 4 Save the phone number s 5 Select SNMP Traps Configur...

Page 12: ...r the data port Configuration Data Ports DLCI Records 2 Save the configuration and return to the Configuration Edit Display menu 3 Select Management PVC Configuration Management and Communication Mana...

Page 13: ...ation is enabled For each DLCI discovered on the network a multiplexed network DLCI and a standard port DLCI will be configured and connected EDLCI 0 creating a PVC within the FrameSaver unit No manag...

Page 14: ...active This feature should be disabled for the central site unit but enabled for the remote unit Automatic backup can be changed at any time via the Auto Backup Criteria configuration options Specific...

Page 15: ...e 2 Insert the other end of the cable into the RJ48C modular jack Connecting to an M66 Block Use the optional T1 mass termination cable to connect up to seven NAMs to an M66 block The T1 mass terminat...

Page 16: ...eSaver 9126 supporting up to 2 B channels An ISDN PRI DBM may be installed in a FrameSaver 9128 supporting up to 23 B channels The following guidelines apply Central site configuration guidelines Conf...

Page 17: ...ter 5 Set up the ISDN Link Profiles Name for the destination entered e g Tampa The default setting is HQ_Site Link Status is set to Auto Phone numbers entered Originating FrameSaver Unit Answering Fra...

Page 18: ...nit is connected to the network SNMP Trap Managers can be configured To enter SNMP managers 1 Select SNMP Traps configuration options Main Menu Configuration Management and Communication SNMP Traps 2...

Page 19: ...remote site unit run an IP Ping test to ping the NMS at the central site and verify that the entire path from the remote unit to the NMS is functioning To run the IP Ping test NMS trap managers must...

Page 20: ...of the cable into the modem service RJ11C jack Connecting to the ISDN 1 Insert the 8 pin connector on the ISDN cable into the MDM interface 2 Insert the other end of the cable into the ISDN service RJ...

Page 21: ...page 10 Otherwise refer to the status information in Displaying System Information of the User s Guide Check the ISDN Setup 1 Verify the ISDN lines by checking the DBM Interface Status Main Menu Statu...

Page 22: ...service provider 2 Check Health and Status messages in the left column of the System and Test Status screen to verify that there are no DSX 1 Health and Status messages Main Menu Status System and Tes...

Page 23: ...e counts that are displayed In the User s Guide see Displaying System Information for additional status information and Troubleshooting for additional troubleshooting information Check PVC Connections...

Page 24: ...to dangerous high voltage points or other risks Refer all servicing to qualified service personnel 6 General purpose cables are provided with this product Special cables which may be required by the r...

Page 25: ...nditioned by the requirements that no modifications will be made to the equipment unless the changes or modifications are expressly approved by Paradyne In order to maintain compliance with FCC limits...

Page 26: ...ent refer to the Warranty Sales Service and Training Information on page 28 Make the T1 network connection using a Universal Service Order Code USOC type RJ48C jack for single line installations and t...

Page 27: ...of the local telecommunications company The equipment must also be installed using an acceptable method of connection The customer should be aware that compliance with the above conditions may not pre...

Page 28: ...representative Within the U S A call 1 800 870 2221 Outside the U S A call 1 727 530 2340 Document Feedback We welcome your comments and suggestions about this document Please mail them to Technical...

Reviews: