23
Connecting to the DTE
1. Connect one end of the DTE’s V.35 cable to the data port.
2. Plug the other end of the cable into the DTE.
3. Tighten the screws on each side of the connector to secure them.
POWER
COM
NETWORK
DSX-1
98-15828
(FrameSaver 9124
Shown)
DTE
If installing a FrameSaver 9128, repeat this procedure for the second port.
Verification Check:
Is the port OK LED on?
– If yes, the port is ready to communicate.
– If no, check that both ends of the V.35 cable are properly seated and secured.
Check Health and Status messages in the left column of the System and Test
Status screen for messages.
Main Menu
→
Status
→
System and Test Status
– If System Operational appears, the Port-1 interface is set up correctly and
is operational.
– If System Operational does not appear, refer to the status information in
Displaying System Information of the User’s Guide.
NOTE:
When any error conditions are detected, a status message will appear at the
bottom right corner of the screen.
If installing a FrameSaver 9126 or 9128, proceed to
Connecting to the ISDN
on page 26 if the unit is equipped with an ISDN DBM. Otherwise, proceed to
Connecting to the Modem on page 25.