
Configuration Option Tables
A-3
7520-A2-GB20-20
May 1998
Table A-1.
System Options (2 of 2)
Test Timeout
Possible Settings: Enable, Disable
Default Setting: Disable
Allows user-initiated tests to end automatically.
Enable – User-initiated loopback and pattern tests end when test duration is reached.
Disable – Tests must be terminated manually from the Network Tests screen. Refer to
Running Network Tests
in Chapter 5.
NOTE:
Tests commanded by the DTE or network-initiated tests are not affected by
this test timeout.
Test Duration (min)
Possible Settings: 1–120
Default Setting: 10
Determines the number of minutes for a test to be active before automatically ending.
Test Duration (min) option appears when Test Timeout is enabled.
1 to 120 – Amount of time in minutes for a user-initiated test to run before terminating.
Summary of Contents for 7520
Page 1: ...MODEL 7520 DSU USER S GUIDE Document No 7520 A2 GB20 20 May 1998...
Page 6: ...Contents iv 7520 A2 GB20 20 May 1998 This page intentionally left blank...
Page 24: ...Customizing the DSU 3 4 7520 A2 GB20 20 May 1998 This page intentionally left blank...
Page 36: ...Monitoring the DSU 4 12 7520 A2 GB20 20 May 1998 This page intentionally left blank...