5
Initial setup:
Site your tub on a level, compact surface.
A 15amp or 10amp professionally wired exterior power-point needs to be within
5m (the length of supplied power cord that comes with the pump) of the tub.
The pump unit needs to be kept dry. If you have not bought from us a pump
box or pump steps, either place the pump unit where it is covered from the
weather or construct a waterproof box to place over it.
Installation procedure of the pump unit:
1
. If you have been supplied pump steps or a pump box,
remove the wall
piece
of this item and
place the base piece hard up against the tub wall
correctly into position.
If you have not been supplied pump steps or a pump box, skip to the next
step.
2
.
Connect the drain hose fitting
(shipped inside the
tub) to the labeled drain fitting part on the tub wall
located in the opening on the tub.
Use the provided hose clamp.
3
. If you have been supplied pump steps or a pump box-
Unscrew the 3 screws
holding the pump to the shipping pallet.
Carefully
slide across the whole pump unit
(leave screwed to the 12mm
plywood piece) onto the pump steps or pump box base piece and place up
against the tub wall making sure that the 2 pump/heater fittings line up with
the 2 corresponding tub fittings.
Make sure there is an even gap either side of the pump unit
for the
pump steps or pump box wall piece to slide in and fit correctly.
If you have not been supplied pump steps or a pump box:
Unscrew the 3 ‘shipping’ screws
holding the pump to the shipping pallet.
Place the pump unit
(keep on the plywood base-don’t unscrew)
up
against the tub wall
.