S4A
S1
S5
S2
S4B
S8
Step 12
Lay out the
Jump Mat (S2)
and align the triangle rings of the mat with the holes in the
L-
Shaped Tube (Left) (S4A)
and the
L-Shaped Tube (Right) (S4B).
Attach a
Spring (S1)
with the hook facing down, onto the triangle ring of the
Jump Mat
(S2)
. Hold the Spring loading tool underhand and pull the spring hook towards the holes
on the surrounding frame. Drop the hook into the frame hole until it latches on. Do this for
all
Springs (S1)
and Triangle Rings.
NOTE: Be careful not to pinch hands or fingers on
Springs (S1).
Wear gloves to prevent
pinching. Keep
Springs (S1)
dry, because wet Springs are very slippery.
25
ASSEMBLY
22
S4B