3
STEP 3
•
Remove the three 1/4” CAP NUTS and each TENSION
CORD from the TOP BOOM as shown in FIGURE 3.
FIGURE 3
CORD
CAP NUT
• Remove the three TENSION CORDS from the D-RING by
removing the three KEYHOLE CLEVIS, CLEVIS PINS,
and COTTER PINS as shown in 4.
FIGURE 4
STEP 4
CORD
COTTER PIN
CLEVIS PIN