2
© Copyright 2008 Panoramic Corporation
Table of Contents
Table of Contents..........................................................................................................................2-4
Introduction ...................................................................................................................................5-6
Purpose ..................................................................................................................................... 5
Statement of Compatibility ........................................................................................................ 5
Limited Warranty ....................................................................................................................... 6
Voltage Regulator Warning ....................................................................................................... 6
X-Ray Shielding Requirements ................................................................................................. 6
Pre-Installation Check ..................................................................................................................... 7
Electrical Requirements
Control Panel Orientation
Cephalometric Arm Orientation
Remote Switch
Darkroom Requirements
PC-1000 Installation
PC-1000 Components .............................................................................................................. 8
PC-1000 Installation .............................................................................................................9-17
Tools Required ....................................................................................................... 9
Verify Power .......................................................................................................... 9
Remove Packaging and Shipping Restraints ........................................................ 9
Control Panel Relocation ....................................................................................... 9
Install Side Covers ............................................................................................... 10
Install Film Drum Assembly ................................................................................. 11
Install Tubehead Assembly .................................................................................. 12
Install Temple Supports ....................................................................................... 12
Level Machine ..................................................................................................... 12
Perform mA Calibration ....................................................................................... 13
Perform Pulse Count Calibration ....................................................................14-15
Perform X-ray Beam Alignment ........................................................................... 16
Install Top and Rear Covers ................................................................................ 17
Complete Installation ........................................................................................... 17
PC-1000/Laser 1000 Installation
PC-1000/Laser 1000 Components ......................................................................................... 18
PC-1000/Laser 1000 Installation ........................................................................................19-39
Tools Required ..................................................................................................... 19
Verify Power ........................................................................................................ 19
Remove Packaging and Shipping Restraints ...................................................... 19
Control Panel Relocation ..................................................................................... 19
Install Side Covers ............................................................................................... 20
Install Film Drum Assembly ................................................................................. 21
Install Tubehead Assembly .................................................................................. 22
Install Temple Supports ....................................................................................... 22
Level Machine ..................................................................................................... 22
Install Cephalometric Arm .................................................................................... 23
Install Cephalostat Head Positioner .................................................................... 23
Perform mA Calibration ..................................................................................24-25
Summary of Contents for PC-1000
Page 39: ...39 Copyright 2008 Panoramic Corporation Notes...
Page 56: ...Appendix Copyright 2008 Panoramic Corporation G Final Assembly...
Page 58: ...Appendix Copyright 2008 Panoramic Corporation G Base Assembly...
Page 60: ...Appendix Copyright 2008 Panoramic Corporation G Main Chassis Assembly...
Page 62: ...Appendix Copyright 2008 Panoramic Corporation Chinrest Arm Assembly G...
Page 64: ...Appendix Copyright 2008 Panoramic Corporation Head Support Assembly G...
Page 66: ...Appendix Copyright 2008 Panoramic Corporation Film Drum Assembly G...
Page 68: ...Appendix Copyright 2008 Panoramic Corporation Upper Belt Drive Assembly G...
Page 70: ...Appendix Copyright 2008 Panoramic Corporation Belt Drive Assembly G...
Page 72: ...Appendix Copyright 2008 Panoramic Corporation Roller Orbit Drive Assembly G...
Page 74: ...Appendix Copyright 2008 Panoramic Corporation Rotating Arm Assembly G...
Page 76: ...Appendix Copyright 2008 Panoramic Corporation Screw Motor Assembly G...
Page 78: ...Appendix Copyright 2008 Panoramic Corporation Tubehead Assembly G...
Page 80: ...Appendix Copyright 2008 Panoramic Corporation Electronics Assembly G...
Page 82: ...Appendix Copyright 2008 Panoramic Corporation Control Panel Assembly G...
Page 84: ...Appendix Copyright 2008 Panoramic Corporation Laser Collimator Assembly G...
Page 86: ...Appendix Copyright 2008 Panoramic Corporation Electromagnet Assembly G...
Page 88: ...Appendix Copyright 2008 Panoramic Corporation H System Wiring Schematic...
Page 89: ...Appendix Copyright 2008 Panoramic Corporation Control Panel Schematic H...
Page 90: ...Appendix Copyright 2008 Panoramic Corporation Timer Circuit Board Schematic H...
Page 91: ...Appendix Copyright 2008 Panoramic Corporation X ray Control Schematic 1 3 H...
Page 92: ...Appendix Copyright 2008 Panoramic Corporation X ray Control Schematic 2 3 H...
Page 93: ...Appendix Copyright 2008 Panoramic Corporation X ray Control Schematic 3 3 H...
Page 94: ...Appendix Copyright 2008 Panoramic Corporation Laser Power Control Schematic H...