background image

For Technical Support: www.panduit.com/resources/install_maintain.asp

INSTRUCTIONS V00028FG REV 11

A

B

C

D

Page 2 of 4

Step 3

Hinging side assembly on the two fasteners affixed in Step 2, rotate Side assembly upwards 
to align mounting holes in the two top brackets. Install remaining (6) 3/8" Bolts and paint 
piercing washers in the locations shown below. Stand the rack upright. Verify #12-24 tapped 
holes or Cage nuts are EIA spaced at 18.31". Square the rack vertically by measuring the 
distance from A to D, and B to C shown in 3.2. The difference in distance from A to D, and B 
to C should be no greater than 1/8". Square the rack horizontally by measuring the distance 
from E to H, and F to G shown in 3.3. The difference in distance from E to H, and F to G 
should be no greater than 1/8".

 Completely tighten all bolts to at least

14 ft.-lbs (19.0 N-m)

3.1

3.2

Grounding 

Two hole ground lug attachment located on 
the top and bottom rails of the side channel 
assembly at the locations shown. Remove 
masking before installing.

Grounding 
Locations

Mount rack to floor using the location guide below for mounting 
hole and overall size information.

Location Guide

Note:

 Floor mounting bolts must be used in all applications in order to 

provide maximum rigidity, load bearing capacity and safety.The maximum 
weight load is 2500 pounds. The rack is designed for heavier equipment 
to be mounted near the bottom and supported from front to back. Shelves 
(sold separately) that mount on both the front and rear of the rack may 
also be installed to support equipment. Manufacturers often provide a 
shelf (or cradle) to support their specific equipment. In cases where the 
manufacturer doesn’t provide a cradle, please contact Panduit engineer-
ing prior to installation for possible alternative mounting methods.

                All dimensions are in inches.

X.XX

 are dimensions for 30" deep 4 post racks

[x.xx] are dimensions for 23" deep 4 post racks
{x.xx} are dimensions for 36" deep 4 post racks
*x.xx* are dimensions for 42" deep 4 post racks
**x.xx** are dimensions for 23" wide 4 post racks

Adjustable EIA Mounting Rails

All 4 rails are fully adjustable. To set depth loosen (3) 5/16"-18 X   
3/4" Mounting bolts and slide to desired position. 

Re-tighten to 

20 foot pounds to engage washers.

Bolt Orientation

Panduit recommends putting the front rails 1" back for optimal 
thermal and cable management.
Front rails are to be recessed less than 1.5" to be compatible with 
newer thermal ducts.

E

F

G

H

3.3

35.6   [28.6]

{41.6} *47.1*

 30.0   [23.0]
{36.0}  *41.5*

   23.25
**27.25**

  33.5       [26.5]
Turned    Turned
  Out          Out
 {39.5}     *45.0*
Turned    Turned
   Out         Out

 16.00
**20.0**

  26.7      [19.70]
Turned    Turned
    In            In
 {32.7}     *38.2*
Turned    Turned
    In            In

Summary of Contents for R4P

Page 1: ...8 3 8 bolts and paint piercing washers DO NOT TIGHTEN Note The base angles are assembled on the bottom of the rack and the top angles are assembled at the top of the rack A dia mond on the outer face of each post indicates the bottom of the rack See closeup in Step 2 2 Side Channel Assembles 2 Base Angles 2 Top Bracket 1 Hardware Kit 25 12 24 x 5 Screws 16 Paint Piercing Washers 16 3 8 x 1 Bolts 1...

Page 2: ...er to provide maximum rigidity load bearing capacity and safety The maximum weight load is 2500 pounds The rack is designed for heavier equipment to be mounted near the bottom and supported from front to back Shelves sold separately that mount on both the front and rear of the rack may also be installed to support equipment Manufacturers often provide a shelf or cradle to support their specific eq...

Page 3: ...aces that the 3 8 paint piercing washers will come in con tact with Mounting Locations Fig 1 CVPPB Zero RU Bracket to mount 1RU EIA 19 copper and fiber patch panels to the side of rack posts CVPPB Secure to desired hole location using 12 24 screws Side of post installation RSHLF Shelf for 30 Deep rack RSHLF23 Shelf for 23 Deep rack RSHLF36 Shelf for 36 Deep rack Mount bracket to desired RU in rear...

Page 4: ...kets CNSPE C shaped cutout on post Bridge lance on bracket Large equipment installation Install mounting cradle included with equipment See Best Practices below Large equipment installation Install equipment When install ing securing hardware install bottom top middle screws and tighten before installing remaining screws See Best Practices below mounting cradle Equipment Top Middle Bottom LARGE EQ...

Reviews: