background image

INSTRUCTIONS CM315E

For instuctions in Local Languages

and Technical Support:

www.panduit.com/resources/install_maintain.asp

E-mail:

[email protected]

Phone

:

866-405-6654

www.panduit.com

Page 11 of 11

Recommended Cable Routing Guide

cL

cL

Place patch cord slack around furthest spool as feasible to 
provide best possible cable management

Top View of PZCHSM2

Recommended Mounting Locations 
for Bend Radius Posts

Never cross over center line of horizontal slack manager 
with cable slack

Typical patch cord length is 4 feet minimum
Route patch cords as shown to avoid crossover

Typical patch cord length is 5 feet minimum
Route patch cords as shown to avoid crossover

Recommended Mounting Locations
for Bend Radius Posts

Lower
Horizontal
Manager

Route patch cords going to top horizontal 
slack towards the outside of the cabinet to 
avoid cross overs with patch cords going 
to lower slack manager.

Routed to top Horizontal
Slack Manager

Summary of Contents for PANZONE PZWMC

Page 1: ...tprint with Cabinet Open 25 0 Cabinet Width PANZONE Wall Mount Cabinet Part Numbers PZWMC Location Footprint PZWMC12W Cabinet with Windowed Door Parts Included 1 Extra Door Spacer 8 Keys 1 Roll of Tak...

Page 2: ...om wall and tighten the hardware securely Re install door and side panels Door swing direction can be changed by rotating the door 180 Ensure the plastic spacer is placed at the bottom of the door hin...

Page 3: ...net Jumper Grounding Kit Only 2 Recommended for direct 1 1 switch patching only 3 Recommended for direct 1 1 switch patching only 4 Default Rail Location Recommended for traditional patching with smal...

Page 4: ...k loop to prevent cable damage Route cable to point 1 secure to tie down with a TAK TY Next route cable across the bottom of the enclosure to point 2 secure to tie down with a TAK TY Route to the desi...

Page 5: ...uipment Rail Kits PZCHSM2 PANZONE Horizontal Slack Manager PZWMC12W Shown Cabinet with Window Door PZBR3 5 PANZONE 3 5 Bend Radius Post Kit PZCFK PANZONE Fan Kit PZBR3 PANZONE 3 Bend Radius Post Kit P...

Page 6: ...rio 1 Switches not exceeding 120 watts of total heat output use fan kit as shown Scenario 2 POE Power over Ethernet or switches totaling over 120 watts of total heat use two PZCFK fan kits or one PZWM...

Page 7: ...on for optimal mounting location s Screw Mounting Locations Figure 3 Bend Radius Post Installation Bend radius posts can be installed at any rack location using 1 12 24 x 2 5 1 12 24 x 1 5 for PZBR3 s...

Page 8: ...et and save cams for later use Figure 2 Remove the Cylinder Nut from the Combination Lock and insert the Spacer Ring over the Lock Cylinder Figure 3 Install the Combination Lock onto the Cabinet and t...

Page 9: ...ous lock Flat Washer Lock Washer and Retain ing Screw Figure 7 Set the lock to the factory combination 0 0 0 Test lock rotation direction Adjust cam angle if necessary To Change Combination Set the l...

Page 10: ...f 24 Port Patch Panels PZCHSM2 PZCHSM2 2 RU of Active Equipment 2 RU of Active Equipment 2 RU of Active Equipment PZCHSM2 PZCHSM2 PZCHSM2 2 RU of 24 Port Patch Panels 2 RU of 24 Port Patch Panels 2 RU...

Page 11: ...mended Mounting Locations for Bend Radius Posts Never cross over center line of horizontal slack manager with cable slack Typical patch cord length is 4 feet minimum Route patch cords as shown to avoi...

Reviews: