![Panduit OptiCam 2 FS133 User Manual Download Page 27](http://html.mh-extra.com/html/panduit/opticam-2-fs133/opticam-2-fs133_user-manual_751661027.webp)
OptiCam 2 FS133 Termination Tool User Manual
-
27
-
ST Connector and Boot
1. Grip the boot by the large end and push the boot forward onto the grooved area of the backbone until it is against the
flange. The insertion mark should be at end of backbone.
2. Clean the ferrule end face with a dry wipe. Place the dust cap over the ferrule end.
3. Slide the boot back to release the aramid yarn. Cut the aramid yarn approximately 0.20" (5mm) past the flange. Flare the
aramid yarn evenly around the perimeter of the grooved area of the backbone. Use tweezers for best results. There will
be a slight gap between the cable jacket and the backbone. Push the boot forward and thread clockwise onto the grooved
area of the backbone until it seats against the flange. Best cable retention is achieved when the aramid yarn protrudes
slightly from the flange area.