Our most important
connection is with you.
We have the knowledge and experience
to help you make the most of your
infrastructure investment.
www.panduit.com
Let's Connect
P: 800-777-3300 :: F: 708-532-1811
www.panduit.com/en/support/contact-us.html
Le
800-77
ha
ur most
connectio
h
O
We
e have the know
o help you make t
in
t'
th
tm
ww
m/
ui
ec
30
make the most o
ur
a
53
t/c
t- s.
::
.
77
ct-
t s
p
on
inv
as
1. Final Inspection (type, serial number, product group, etc.)
2. Check head for stop or locking
3. Check the pressure with the housing closed
4. Check if all screws are installed
5. Check whether the machine is “reset”
6. Check if a warning sticker is attached
7. Check whether the inspection sticker is attached
8. Check the cleanliness (oil leakage, case, etc.)
9. Check whether the accessories are complete
10. Check whether the desired test reports are attached (TQ16, etc.)
11. The fi nal inspection is carried out by the Service Center Goods Department
Blackfi n Tools Certifi cate of Calibration
Subject: Panduit BlackFin Series **
The Panduit BlackFin tools have completed the following Testing criteria in the Factory before shipped.
Checklist Final Inspection
The user of the Panduit product is responsible for verifying suitability of the product for the application and assumes all risk and
liability in connection with its use.
HE.20214_A