EN
- THE FIRST IGNITION AND PUTTING IN MARCH / SYNCHRONIZATION REMOTE CONTROL
ON/OFF, Press this symbol to turn on the motor, press again to turn off.
Press this symbol to reduce the motor speed.
Press this symbol to increase motor speed,
Note:
If you have a motor version that exceeds 650m³/h, 3rd or 4th speed will be
LAST TIME:
When the motor is on at any speed, pressing this button will start a 5-minute
timer, at the end of which time the motor and lights will switch off. When on, it is possible to
adjust the speed to the desired level. This function is indicated on the display by flashing
dots.This function offers a visual indicator by flashing the pilot lamp.
Blue LED that will light up whenever a function is pressed.
MAIN OR WORKING LIGHT:
Press to switch on main lights and press again to switch off.
COURTESY OR AMBIENT LIGHT:
(Optionally, depending on model and version) Keeping
the key pressed for 2 seconds will switch on the courtesy light, and continuing pressing will
switch it off again.
A - SYNCHRONIZATING THE REMOTE CONTROL
(* only if necessary, it is already synchronized):
1.
Connect the hood to the mains or turn on the hood switch, optional under filters or panel.
2.
ATTENTION!
: once step 2 is completed, when connecting the hood to the electricity:
DO NOT TOUCH ANY COMMAND KEY
UNTIL AFTER 5 SECONDS
3.
After the first 5 seconds
, in the interval time between 5 and 20 seconds, with the remote control facing the hood,
press or hold the LIGHT button
on the remote control, and the lights on the hood will light up,
confirming that the process has been successfully performed.
If it takes more than 20 seconds to synchronize the control, the hood switchboard closes the reception and
does not record any code, you must repeat the process, making sure to press the key between 5 "and 20".
be
time limited
.(*see Ecodesign Timer section).
25
Summary of Contents for E-290
Page 2: ...2 ...
Page 14: ...INSTALACIÓN INSTALAÇÃO INSTALLATION INSTALLATION 1 2 14 ...
Page 16: ...INSTALACIÓN INSTALAÇÃO INSTALLATION INSTALLATION 5 6 16 ...
Page 17: ...7 8 INSTALACIÓN INSTALAÇÃO INSTALLATION INSTALLATION 17 ...
Page 18: ...INSTALACIÓN INSTALAÇÃO INSTALLATION INSTALLATION 9 10 18 ...
Page 19: ...INSTALACIÓN INSTALAÇÃO INSTALLATION INSTALLATION x4 11 x4 x4 19 ...
Page 21: ...15 16 INSTALACIÓN INSTALAÇÃO INSTALLATION INSTALLATION 21 ...
Page 29: ...INOXPAN S L NOTAS NOTAS REMARQUES NOTES 29 ...
Page 30: ...INOXPAN S L NOTAS NOTAS REMARQUES NOTES 30 ...
Page 31: ...INOXPAN S L 31 ...