P&M QUIK-GTR Manual, ref. QUIK-GTR Man 1.0.doc
Page 39
Rigging stage 12
– correct positioning of washout rods.
14.Fit the undersurface battens and secure them with the single bungees.
Rigging stage 13
15.Engage each tip fin on the leading edge spigot and then attach the two clevis pins with nylon washers
and safety clips.
Summary of Contents for QUIK-GTR
Page 73: ...P M QUIK GTR Manual ref QUIK GTR Man 1 0 doc Page 73...
Page 87: ...P M Aviation Quik GTR Manual Quik GTR1 0doc Page 87...
Page 89: ...P M Aviation Quik GTR Manual Quik GTR1 0doc Page 89...
Page 90: ...P M Aviation Quik GTR Manual Quik GTR1 0doc Page 90...
Page 91: ......
Page 94: ...P M Aviation Quik GTR Manual Quik GTR1 0doc Page 94...
Page 95: ...P M Aviation Quik GTR Manual Quik GTR1 0doc Page 95...