P&M QUIK-GTR Manual, ref. QUIK-GTR Man 1.0.doc
Page 38
``
11. Disconnect the rigging tool pulley from the keyhole tang and remove the rigging tool from the rear of the
keel. Ensure that the previously fitted ribs are pushed FULLY home. Engage the over-centre levers
and tension them, ensuring they lie flat against the bottom of the sail. Tip the wing carefully onto it’s
nose.
Rigging stage 11
12. Ensure both the inner and outer washout rods are fully home and not caught on any ribs. The inner rod
can be seen through the zip access panel and the outer rod through the Velcro panel in the
undersurface.
13. Ensure the STARS system is routed correctly as shown by the GA drawing.
The rigging tool must be removed before flight
and before attempting to start the engine.
If the rigging tool is not removed, the propeller
will strike it.
WARNING
!
Summary of Contents for QUIK-GTR
Page 73: ...P M QUIK GTR Manual ref QUIK GTR Man 1 0 doc Page 73...
Page 87: ...P M Aviation Quik GTR Manual Quik GTR1 0doc Page 87...
Page 89: ...P M Aviation Quik GTR Manual Quik GTR1 0doc Page 89...
Page 90: ...P M Aviation Quik GTR Manual Quik GTR1 0doc Page 90...
Page 91: ......
Page 94: ...P M Aviation Quik GTR Manual Quik GTR1 0doc Page 94...
Page 95: ...P M Aviation Quik GTR Manual Quik GTR1 0doc Page 95...