3
• Select an installation area that can support the total weight.
If a selected area is too weak to support the total weight, a fall of the product may occur
resulting in injury. Installation work shall be started after sufficient reinforcement.
• Periodic inspections shall be conducted.
Rust on the metal parts or screws may cause a fall of the product resulting in injury. Consult
the dealer for the inspections.
• Do not rub the edges of metal parts with your hand.
Failure to observe this may cause injury.
• Consult the dealer about the installation area to select a strong ceiling area. Make sure that
the installation area is strong enough to hold the total weight of the camera assembly
(approx. 1.7 k
g
{3.6 lbs.}) before installation.
• The installation area shall have 180 mm {7-1/8"} or more space behind the ceiling.
• The thickness of the ceiling board for installation can range between 9 mm {3/8"} and
40 mm {1-9/16"}.
• Avoid installing in the following locations.
• Locations where it may get wet from rain or water splash (not only outdoor)
• Locations where a chemical agent is used such as a swimming pool
• Locations subject to steam and oil smoke such as a kitchen
• Locations near flammable gas or vapor
• Locations where radiation or x-ray emissions are produced
• Locations subject to strong magnetic field or radio waves
• Locations where it may be damaged by briny air such as seashores
• Locations where the temperature is not within –10 °C - +50 °C {14 °F - 122 °F}.
• Locations subject to vibrations (This product is not designed for on-vehicle use.)
• Locations where the temperature may rapidly change such as the peripheral areas of
the air outlets of air conditioners or doors facing outside. (In case of installing the cam-
era in such locations, the dome cover may become foggy or condensation may be
caused on the cover.)
• The screws and bolts must be tightened with an appropriate tightening torque according to
the material and strength of the installation area. After tightening the screws or bolts, per-
form visual check to ensure tightening is enough and there is no backlash.
• The pull-out strength of the installation area shall be 196 N {20 k
g
f} or more per 1 screw.
• The protection sheet attached to the dome cover shall be peeled off after installation.
180 mm {7-1/8"} or more
Ceiling board: between 9 mm {3/8"}
and 40 mm {1-9/16"}