12.1.6 Installation of Network Adaptor and Base Pan Heater
Network Adaptor and Installation (Optional)
12.1.6.1
1.
Open the Cabinet front plate, then connect the
Network Adaptor
Cable
to the CN-CNT
connector on the printed circuit board.
o
Pull the cable out of the Mono bloc unit so that
there is no pinching.
o
If an optional PCB has been install in the
Mono bloc unit, connect the CN-CNT
connector to Optional PCB.
2.
Insert a flat head screwdriver into the slot on
the top of the
adaptor and remove the cover.
Connect the other end of the
CN-CNT cable
connector to the connector inside the adaptor.
3.
On the wall near the Mono bloc
unit, attach the
adaptor by
screwing screws through the
holes
in the back cover.
4.
Pull the CN-CNT cable through
the hole in the
bottom of the
adaptor and re-attach the front
cover to the back cover.
5.
Use the included cord clamp to fix the CN-
CNT cable to the
wall.
Pull the cable around as shown in the diagram
so that external forces cannot act on the
connector in the adaptor. Use the included
cable tie to fix the cables together.
Base Pan Heater (Optional)
12.1.6.2
It is strongly recommended to install a Base Pan Heater (optional) if the Mono bloc unit is installed in cold climate
area. Refer the Base Pan Heater (optional) installation instruction for details of installation.
12.1.7 Charging the Water
Make sure all the piping installations are properly
done before carry out below steps.
1 Open Cabinet front plate to access to the
Pressure Relief Valve and Air Purge Valve.
2 Turn the plug on the Air Purge Valve outlet
anticlockwise by one complete turn from fully
closed position.
3 Set the Pressure Relief Valve level “DOWN”.
4 Start filling water (with pressure more than
0.1 MPa (1 bar)) to the Mono bloc unit via
water inlet. Stop filling water if the free water
flow through Pressure Relief Valve drain hose.
5 Turn ON the power supply and make sure
Water Pump is running.
6 Check and make sure no water leaking at the
tube connecting points.
7 Reinstall the Cabinet front plate by tightening
the 2 mounting screws.
A
L
N
L
1
WARNING
ABCDEFGHJMFLG
ABCDEFGHJMFLG
ABCDEFGHJMFLG
ABCDEFGHJMFLG
2
Y
L
P
P
U
S
R
E
W
O
P
1
Y
L
P
P
U
S
R
E
W
O
P
N
1
B
CAUTION
240-250V
Network
Adaptor
cable
Bind all
lead wires
with these
bands
PCB
1
A
L
N
L
1
WARNING
CAUTION
240-250V
ABCDEFGHJMFLG
ABCDEFGHJMFLG
ABCDEFGHJMFLG
ABCDEFGHJMFLG
N
1
B
POWER SUPPLY 1
POWER SUPPLY 2
Network
Adaptor
cable
Without Optional PCB
With Optional PCB
S
lot
Connector
S
crew
s
CN-CNT c
ab
le
(T
a
ke c
a
re not to
pinch the c
ab
le)
A
L
N
L 1
W ARNING
ABCDEFGHJMFLG
ABCDEFGHJMFLG
ABCDEFGHJMFLG
ABCDEFGHJMFLG
POWER SUPPLY1
POWER SUPPLY2
N
1
B
CAUTION
240-250V
Cord cl
a
mp
C
ab
le tie
Air p
u
rge v
a
lve
b
Pl
u
g (t
u
rn
a
nticlockwi
s
e
b
y
one complete
t
u
rn)
Pre
ssu
re relief v
a
lve
a
Pre
ssu
re
relief v
a
lve
a
Lever
T
u
rn down
or
Pre
ssu
re relief
v
a
lve
a
Lever
T
u
rn down
Pre
ssu
re relief v
a
lve
a
Summary of Contents for WH-MXC09J3E5
Page 38: ...38 8 Block Diagram ...