31
37. Sterilization
Initial setting: 65°C 10min
②
① ③
Set timer to perform sterilization.
1
Set operating day & time. (Weekly timer format)
2
Sterilization temp (55~65°C)
3
Operation time (Time to run sterilization when it reached setting temp
5min ~ 60min)
User shall set whether to use or not to use sterilization mode.
3-5. Service Setup
38. Pump maximum speed
Initial setting: Depend on model
Service setup
12:00am,Mon
Flow rate
Max. Duty
Operation
88:8 L/min
0xCE
Air Purge
Select
Normally setting is not necessary.
Please adjust when need to reduce the pump sound etc.
Besides that, it has Air Purge function.
When *Pump fl ow setting is Max. Duty, this duty set is the fi x pump duty run
during room side operation.
39. Dry concrete
30°C
1
2
3
4
5
6
35°C
35°C
40°C
40°C
45°C
Stage
Operate concrete curing operation.
Select Edit, set temp for every stage (1~99 1 is for 1 day).
Setting range is 25~55°C
When it is turned ON, dry concrete starts.
When it is 2 zone, it dries both zones.
40. Service contact
Contact-1: Bryan Adams
ABC/ abc
0-9/ Other
A B C D E F G H I J K L M N O P Q R
S T U V W X Y Z
a b c d e f g h i
j k l m n o p q r s t u v w x y z
Select
Enter
Service setup
12:00am,Mon
Service contact:
Contact 1
Contact 2
Select
Confi rm
Able to set name & tel no. of contact
person when there is breakdown
etc. or client has trouble. (2 items)
3-6. Remote control setup
41. RC selection
Initial setting : Single
RC selection
12:00am,Mon
Single
Dual
Select
Confi rm
Set to "Single" when only one remote controller is installed.
Set to "Dual" when two remote controllers are installed.