18
English
Assembly Procedure
1. Preparing the display
Installation must be carried out by at least two
people.
Spreading out a soft cloth, etc., place the display
with the screen facing down.
●
Be careful not to damage the display screen, for
example, by dragging it.
●
When placing the display with the screen facing down,
or lifting it up, never hold or put pressure on the LCD
screen. The LCD screen may be damaged.
Protective sheet
Base
●
The surface without the label comes to the front of the
display.
Front of the display
Label
Pedestal tube
●
Always use the specified holes to attach the pedestal.
1
2
3
4
5
6
7
8
The side with the nuts comes
to the downside.
Display
Top screw
position
Bottom screw
position
Display
installation screw
Screw pitch for
installation
65-inch model
1
5
M8 × 40
400 mm × 400 mm
Check before assembling