15
English
Assembly Procedure
(Cont’d)
2) Fix with the 4 display installation screws .
Tightening torque: 1.6 to 2.2 N•m
Note
●
Do not install the display vertically using the pedestal.
Display installation screw
3. Attaching the base
■
Base
●
Position the convex part side at the front side of the
display.
Front of the display
Convex part
1) Insert the base to the pedestal tube.
●
Make sure that the orientation of the front side and
back side of the base are correct.
● Be careful not to drop.
2) Fix the bases (upper part) with the 2 base
installation screws .
●
Tighten the base installation screws from the outside
of the pedestal tube.
Tightening torque: 1.2 to 1.5 N•m
3) Using the 2 base installation screws , fix the
bases (lower part) together with the 2 overturn-
prevention belts and the 2 spacers .
●
Tighten the base installation screws from the outside
of the pedestal tube.
Tightening torque: 1.2 to 1.5 N•m
4) To stand the display vertically.
●
Make sure to hold the display with more than two
people.
Base
Base installation
screw
Base installation
screw
Overturn-prevention
belt
Specer
Base installation
screw
Note
● Be sure to attach the overturn-prevention belt when
attaching the base.
Summary of Contents for TY-ST55PE9
Page 2: ...2 ...