Remove the 8 screws A. (refer to
Figure-1
).
(Step 2)
Remove the top cabinet assy. (refer to
Figure-1
).
(Step 3)
Release the 3 connectors of binding cables on each P.C.B. (refer to
Figure-1
).
Figure-1
6.2. Removing the MAIN P.C.B. and CPR P.C.B.
- Follow the item 6.1.
- Release the connectors of the P.C.B..
MAIN P.C.B.(Step 1)
Remove the 4 screws A. (refer to
Figure-2
).
(Step 2)
Remove the MAIN P.C.B..
CPR P.C.B.(Step 1)
Remove the 8 screws B. (refer to
Figure-3
).
(Step 2)
Remove the CPR P.C.B.
(Step 3)
Release the connector of the CN2.
7
Summary of Contents for SY-PA100
Page 24: ...24...
Page 25: ...12 MEASURING CONDITION 12 1 Measuring condition of MAIN P C B Check Point 1 9 25...
Page 45: ...45...
Page 46: ...19 PACKAGING 46...