78
Step 20 :
Lay the AC IN P.C.B. on an insulation sheet.
Step 21 :
Check and repair AC IN P.C.B. according to the dia-
gram shown.
10.7. Checking and Repairing SMPS
P.C.B.
• Follow the (Step 1) - (Step 20) of item 10.6.
Step 1 :
Remove 2 screws.
Step 2 :
Flip and lay the SMPS P.C.B. on the insulation sheet.
Summary of Contents for SC-HC4GK
Page 11: ...11 5 Location of Controls and Components 5 1 Main Unit Key Button Operations ...
Page 12: ...12 5 2 Remote Control Key Button Operations ...
Page 13: ...13 6 Operating Instructions 6 1 Disc and MP3 Information ...
Page 23: ...23 9 2 Type of Screw 9 3 Main Parts Location Diagram ...
Page 132: ...132 FLE0907 ...