Some chassis components may have sharp edges.
Be careful when disassembling and servicing.
11 Disassembly and Main Component Replacement
Procedure
“ATTENTION SERVICER”
1.
This section describes procedures for checking the operation of the major printed circuit boards and replacing the
main components.
2.
For assembly after operation checks or replacement, reverse the respective procedures.
Special reassembly procedures are described only when required.
3.
Select items from the following index when checks or replacement are required.
·
Disassembling the Top Cabinet
·
Disassembling the Lid assembly (When taking out disc manually)
·
Disassembling the Front Panel
·
Disassembling the FL P.C.B. and Volume P.C.B.
·
Disassembling the DVD mechanism Unit
·
Disassembling the DVD Module P.C.B
·
Disassembling the Rear panel
·
Disassembling the Scart P.C.B.
·
Disassembling the Main.P.C.B.
11.1. Disassembly Procedure
21
SA-HT885WEG
Summary of Contents for SA-HT885WEG
Page 11: ...11 SA HT885WEG ...
Page 22: ...11 2 Main Components and P C B Locations 22 SA HT885WEG ...
Page 38: ...38 SA HT885WEG ...
Page 56: ...SA HT885WEG 56 ...
Page 66: ...SA HT885WEG 66 ...
Page 70: ...SA HT885WEG 70 ...
Page 72: ...SA HT885WEG 72 ...
Page 77: ...77 SA HT885WEG ...
Page 89: ...27 4 Packaging 89 SA HT885WEG ...