4. Remove the belt.
5. Unlock the tab and remove the pulley.
6. Remove the relay gear.
7. Turn the change lever in the arrow direction till it stops.
8. Hook the change lever spring on the change lever project part
temporarily.
34
PDF created with pdfFactory Pro trial version