1 Safety Precautions
1.1.
General Guidelines
1. When servicing, observe the original lead dress. If a short circuit is found, replace all parts which have been overheated or
damaged by the short circuit.
2. After servicing, see to it that all the protective devices such as insulation barriers, insulation papers shields are properly
installed.
3. After servicing, carry out the following leakage current checks to prevent the customer from being exposed to shock hazards.
1.1.1.
Leakage Current Cold Check
1. Unplug the AC cord and connect a jumper between the two prongs on the plug.
2. Measure the resistance value, with an ohmmeter, between the jumpered AC plug and each exposed metallic cabinet part on
the equipment such as screwheads, connectors, control shafts, etc. When the exposed metallic part has a return path to the
chassis, the reading should be between 1M
7
and 5.2M
7
.
When the exposed metal does not have a return path to the chassis, the reading must be
1.1.2.
Leakage Current Hot Check
1. Plug the AC cord directly into the AC outlet. Do not use an isolation transformer for this check.
2. Connect a 1.5k
7
, 10 watts resistor, in parallel with a 0.15
M
F capacitors, between each exposed metallic part on the set and a
good earth ground such as a water pipe, as shown in Figure 1.
3. Use an AC voltmeter, with 1000 ohms/volt or more sensitivity, to measure the potential across the resistor.
4. Check each exposed metallic part, and measure the voltage at each point.
5. Reverse the AC plug in the AC outlet and repeat each of the above measurements.
6. The potential at any point should not exceed 0.75 volts RMS. A leakage current tester (Simpson Model 229 or equivalent)
may be used to make the hot checks, leakage current must not exceed 1/2 milliamp. In case a measurement is outside of the
limits specified, there is a possibility of a shock hazard, and the equipment should be repaired and rechecked before it is
returned to the customer.
Figure 1
1.3.
Caution For Fuse Replacement
3
Summary of Contents for SA-AKX12
Page 7: ... M ...
Page 15: ...15 5 3 Media Information ...
Page 26: ...26 7 3 D Amp IC Operation Control ...
Page 30: ...30 8 2 Main Components and P C B Locations ...
Page 52: ...Step 3 Step 4 Step 5 52 ...
Page 59: ...Step 9 Ground the 24P FFC with a short pin 59 ...
Page 70: ...13 Simplified Block Diagram 13 1 Overall Simplified Block Diagram 70 ...
Page 90: ... 90 ...
Page 95: ... 95 ...
Page 96: ... 0 96 ...
Page 97: ... 97 ...