
Fig. J10-2
2. Installation of Opener Piece
a. Install the Opener Piece so that the slot of the Opener
Piece is inserted to the Pin of Pinch Arm Unit
Fig. J10-3
6.2.13. Motor Block Unit, Audio Control
Head Unit, Lift Gear, Capstan
Holder Unit, Tension Arm Boss,
and Cleaner Arm Unit (Model: A, H)
Fig. J11
37
PVQ-1310 / PV-C1320 / PV-C1330W / VV-1300 / VV-1310W / PV-C1340 / PV-C1350W / PV-C2010 / PV-C2020 / PV-C2030W / VV-2000 / PV-C2060