5.2.13. Motor Block Unit, Audio Control Head Unit, Lift Gear, Tension Arm Boss,
and Cleaner Arm Unit
Fig. J11
5.3. CASSETTE UP ASSEMBLY SECTION
How to read chart shown above:
A: Order of Procedure steps.
When reassembling, perform steps(s) in reverse order.
These numbers are also used as the identification (location) No. of
parts in Figures.
B: Steps to be completed prior to the current step.
C: Part to be removed or installed.
D: Fig. No. showing Procedure or Part Location.
E: Identification of part to be removed, unhooked, unlocked,
released, unplugged or unsoldered.
(S-1) = Screw (S-1), (L-1) = Locking Tab (L-1), (W-1) = Washer (W-1),
(P-1) = Spring (P-1), (C-1) = Cut Washer (C-1)
F: Alignment/Adjustment which is required when installing or
33
Summary of Contents for NV-SJ4130PN
Page 6: ...Fig 1 4 Fig 1 5 6 ...
Page 22: ...5 2 3 EJECT Position Confirmation Fig J1 2 22 ...
Page 48: ...10 2 MECHANISM BOTTOM SECTION 48 ...
Page 49: ...10 3 CASSETTE UP COMPARTMENT SECTION 49 ...
Page 50: ...10 4 CHASSIS FRAME AND CASING PARTS SECTION 50 ...
Page 51: ...10 5 PACKING PARTS AND ACCESSORIES SECTION 51 ...
Page 56: ...11 2 MECHANICAL REPLACEMENT PARTS LIST MECHANICAL REPLACEMENT PARTS 56 ...
Page 96: ......
Page 97: ......