T1 TIME
T2 TIME
1 MIN 30 SEC - 4 MIN
8 SEC - 23 SEC
10. Measurements and Adjustments
Warning
- For continued protection against radiation hazard, replace only with
identical parts.
- When the 10 amp fuse is blown due to the operation of the short
switch, you must replace the primary latch switch and short
switch. Then follow the installation procedures below.
- Interlock switch replacement - In replacing faulty switches, be sure
mounting tabs are not bent, broken or otherwise deficient in their
ability to hold the switches.
- Refer to the schematic and wiring diagram to ensure proper
connection.
10.1. Installation of primary latch switch, secondary latch switch and
short switch.
1. When mounting the primary latch switch, secondary latch switch
and short switch to the door hook assembly. Follow the
instructions in figure 1.
NOTE: No specific adjustment during the insulation of each switch
into the door hook is necessary.
2. When mounting the door hook assembly to the oven assembly,
adjust the door hook assembly by moving it in the direction of the
arrow in figure 1. Ensuring the door does not have any play in it.
Check for play by pulling the door assembly. Make sure that the
latch keys move smoothly after adjustment is completed.
Completely tighten the screws holding the door hook assembly to
the oven assembly.
3. Reconnect the short switch, primary switch and secondary latch
switches and check the continuity of the monitor circuit and latch
switches by following the component test procedures on page 17.
10.2. Measurement of microwave output
The output power of the magnetron can be determined by performing the IEC standard test.
However, due to the complexity of the IEC test procedures, it is recommended to test the
31
Summary of Contents for NN-V673SBBPQ
Page 5: ...4 Door Exploded View 5 ...
Page 9: ...9 ...
Page 10: ...10 ...
Page 45: ...Troubleshooting Inverter by Input out voltage Figure 5 35 ...
Page 55: ...20 Digital programmer Circuit 45 ...
Page 56: ...DPC Schematic 1 46 ...
Page 57: ...47 ...