background image

- 7 -

- 14 -

EXPLODED VIEW 

(BODY, MOTOR HOUSING, AND  MOTOR)…        BLOCK

C

Removal

1.

Remove the lower plate as outlined in the LOWER 

PLATE REMOVAL/INSTALLATION section.

2.

Remove the belt and agitator assembly as outlined in

the respective sections.

3.

Remove the nozzle hose by pulling up to remove it from

the nozzle housing.  Pull the nozzle hose out of the back of
the nozzle housing.  

4.

Insert a flat blade screwdriver between the nozzle

housing and the plastic shaft, pry out the plastic shaft as illustrated, 

(Fig.

6)

.

5.

Remove the nozzle housing as illustrated, 

(Fig 7)

.

6.

Remove the window and height adjust assembly.

NOTE:  If the motor case is removed, DO NOT turn vacuum over as
the motor may fall out.

Installation

1.

Install the window and height adjust assembly in the new nozzle.

2.

Fit the nozzle from the motor shaft side first, and rotate it into place on

the dust container as illustrated, (

Fig. 8

).

3.

Slide the plastic shaft through the nozzle housing and into the dust container.  Make sure that the slot on the bottom of

the plastic shaft is down and fitted onto the projection, 

(Fig. 9)

.

4.

Reassemble the nozzle hose by inserting it into the nozzle.  Push the nozzle hose down into the slot in the nozzle

housing.  

5.

Install the belt, agitator assembly, and the lower plate according to the respective instructions.

NOZZLE HOUSING REPLACEMENT

Plastic
Shaft

Nozzle
Housing

(Fig. 7)

(Fig. 8)

Flat-head
Screwdriver

(Fig. 6)

Plastic Shaft

Nozzle
Housing
Projection

(Fig. 9)

Summary of Contents for MCV225 - COMMERCIAL VACUUM

Page 1: ...DIVISION OF MATSUSHITA ELECTRIC CORPORATION OF AMERICA All rights reserved Unauthorized copying and distribution is a violation of law Commercial Vacuum Cleaner Model MC V225 Power Source AC 120V 60 Hz Power Consumption 10 0 Amps Cord Length 50 Ft Motor Protector Yes Height Adjust 4 Position Weight 17 lbs ...

Page 2: ......

Page 3: ...OTE Do not pinch any wires during reassembly After servicing any electrical component or electrical enclosure the unit should be reassembled and checked for dielectric breakdown or current leakage M BLK Motor Housing Fuse BLK BLK BLK BLK BLK BLK GRN WHT WHT ...

Page 4: ......

Page 5: ... 5 EXPLODED VIEW NOZZLE HOUSING BLOCK A ...

Page 6: ......

Page 7: ... 7 EXPLODED VIEW BODY MOTOR HOUSING AND MOTOR BLOCK C ...

Page 8: ......

Page 9: ...EMBLY Ref No Part Name Description Part No Quantity Remarks 1 Fan Case AMC53F AVØØU 1 2 Nut AMC33F ACØØU 1 3 Washer a AMC62F AVØØU 1 4 Fan AC98FRFZØØ 1 5 Washer b AC62FRFZØØ 1 6 Spacer AC6ØFRFZØØ 1 7 Brush Assembly AC27FRFZØØ 1 Set 8 Bracket AMCØ2D V3ØØU 2 9 Screws AMC4ØD V3ØØU 4 ...

Page 10: ......

Page 11: ...er Pull off Lower Plate Release latches and tilt off Agitator Assembly Belt Lift out with end caps Nozzle Housing Pull off Motor Case Remove four screws and pull off On Off Switch Dust Cover Pull off Power Cord Switch Cover Remove two screws and pull off Nozzle Housing Lower Plate Release latches and tilt off Agitator Assembly Belt Lift out with end caps Height Adjust Assembly Remove three 3 screw...

Page 12: ......

Page 13: ... Removal 1 Follow all of the instructions outlined in the agitator assembly removal section Installation 1 Place the new belt around the motor shaft and follow the instructions in the agitator assembly replacement section ...

Page 14: ......

Page 15: ...by prying or cutting remove the wire connectors and wire tie if present 3 Remove the ON OFF switch for ON OFF switch replacement by depressing the switch retaining tabs while pushing up out of the dust compartment at the same time 4 Pull the power cord out of the dust compartment for power cord replacement Continued on p 16 POWER CORD ON OFF SWITCH REPLACEMENT SWITCH COVER AREA WIRING MANAGEMENT F...

Page 16: ......

Page 17: ...he brushes for the approximate dimension as shown in Fig 15 Removal 1 Remove the dust cover by grasping the top near the On Off switch and pulling sharply out toward you 2 Remove the lower plate agitator assembly belt and the nozzle housing as instructed in the respective removal sections 3 Turn the vacuum over to the front side 4 Remove the four 4 screws from the motor case and then remove the mo...

Page 18: ......

Page 19: ...er or carbon brush worn out Adjust or replace ON OFF switch continuity Remove switch cover and check If there is no continuity between continuity across switch terminals both terminals ON OFF switch must be defective Dust bag Check quantity of dust accumulated in Replace dust bag if full Paper dust bag Empty dust bag Cloth Filters Check for dirty filter Clean and or Change Filters Nozzle hose Remo...

Page 20: ......

Reviews: