Installation Manual
Stand-alone Operation
by qualified personnel.
8. Test Run
8-1.Test Run
The following test runs are required before operating this system: the actual operation cannot be performed until test
runs have been completed.
•
Stand-alone Operation Test
•
Reverse Current CT Test
● Test runs are required before the actual operation of the system. Actual operations cannot be performed until test
runs have been completed.
● The work must be performed
8-2. Test Run Selection
■
Preparation
•
Set the storage battery system to the stopped state in the normal state. The system can only be switched to the
parameter setting mode while it is in a stopped state.
■
Operation Procedure
Normal State
Stopped (Grid-connected)
Stopped (Stand-alone)
Test Run Selection
Stand-alone Operation Test
Reverse Current CT Test
3 sec
1 sec
•
Press "CLOCK(▲)"+"MENU(ENTER)" simultaneously for three seconds in the normal state to switch to the test run
selection prompt in the test run mode.
Stand-alone Operation test [TEST1] is displayed initially.
•
Press "ON/OFF (CANCEL)" for one second in the test run selection prompt to return to the normal state.
•
Press "CLOCK (▼)" or "DATA (▲)" in the test run selection prompt to switch between the
test [TEST1] and Reverse Current CT test [TEST2].
NOTICE:
If the destination setting is not set, TEST run operation is not possible (See 7-3).
If DRED setting is not to OFF, TEST run operation is not possible. (See 7-6)