
27
Installation Manual
On each battery, attach two battery fixing brackets that are included with the system.
● Install the battery after the base and main body installation has been completed.
● Do not immerse the battery in liquids (water, sea water, oils, chemical waters ets.), or get it wet.
4-3. Mounting of Lithium-ion Battery
Since the Lithium-ion battery is a heavyweight device, furthermore since it is a rechargeable device, be extremely
careful in handling it, and safely install it.
● Do not modify or disassemble.
● Do not allow water to enter the inside of the main body. Please pay special attention while it is raining or snowing.
● Do not perform work when the scaffolding and/or your hands are wet.
● Do not use a product that has been damaged due to dropping, etc.
● Do not touch or short-circuit the POWER electrodes.
● Do not stack batteries on top of each other that have been taken out of the packaging.
● Wear insulating gloves and insulated shoes while doing the wiring work.
● If the battery electrolytes are leaking, do not touch the liquid with your bare hands.
● Tighten the
screws for each part with adequate torque.
● The work must be performed by
personnel.
● Fix the screws using the appropriate tools.
● Do not remove the connector cover until the wiring is started.
■
Battery Installation
1) Mounting the battery
bracket
For this purpose, use the bracket
screws (M3 x 8) included with the system.
[Tightening torque 0.65 - 0.85 N•m]
Bracket fixing screw x 8 / 1 battery
(M3 × 8)
Bracket fixing bracket x 2 / 1 battery
Summary of Contents for LJ-SK56A
Page 6: ...Installation Manual Installation...
Page 49: ...Installation Manual Setup...
Page 100: ...Installation Manual...