Page 1-21
REGULAR
MAINTENANCE
1
Check Every 24 Hours (Routine)
1E4C-E-MMA01-A05-01
1-3-4
Cleaning the Board Positioning Lifter (After Operation)
After operation, clean the Z plate, clamp claw, load cell, and recognition hole of the board position-
ing unit.
1.
Press
Machine
adjust
at the main menu.
• “Machine Adjustment” menu appears.
2.
Press
UNLOCK
+ Transport oper .
• The “PCB Transfer” screen appears.
3.
Press
UNLOCK
+ Front .
• The X-Y table moves to the operator’s side.
Tools
Cleaning jig for recognition hole
Required time
3 to 4 minutes
Load cell
Clamp claw
Support plate
Recognition hole of board positioning unit
To the next page
180GC1AA
180RC1AA
Summary of Contents for KXF-1E4C
Page 2: ......
Page 6: ...4 1E4C E MMA00 B01 00 MEMO ...
Page 12: ...10 1E4C E MMA00 A02 01 MEMO ...