Please follow the items below when BBIC or EEPROM is replaced.
Items
Adjustment
Point
Procedure
(A)
*
1.8V Supply
Confirmation
TP12
1. Confirm that the voltage between test point “TP12” and GND is 1.8V ± 0.02V.
2. Adjust the 1.8V voltage of TP12 executing command “bandgap XX“ (XX is the value).
(B)
4.0V Supply
Confirmation
TP10
1. Confirm that the voltage between “TP10” and GND is 3.85V ± 0.2V.
(C)
2.7V Supply
Confirmation
TP11
1. Confirm that the voltage between “TP11” and GND is 2.7V ± 0.1V.
(D)
*
BBIC
Confirmation
-
1. BBIC Confirmation (Execute the command "getchk").
2. Confirm the returned checksum value.
Connection of checksum value and program number is
shown below.
IC1,
(E)
Charge
Control Check
& Charge
Current
Monitor
Confirmation
-
1. Apply 6V between J3(+) and J4(-) with current limit of PSU to 200mA.
2. Confirm that the charge current is ON/OFF.
3. SW to decrease current limit of PSU to 100mA.
4. Confirm that the charge current is stable.
(F)
*
Charge
Detection
(OFF)
Confirmation
-
1. Stop supplying 6V to J3(+) and J4(-).
2. Execute the command "charge".
3. Confirm that the returned value is 0x01 (hex).
59
Summary of Contents for KX-TCA151AZV
Page 9: ...9 ...
Page 13: ...6 3 Setting the Ringer Volume 6 3 1 Base Unit 13 ...
Page 14: ...6 3 2 Handset 6 4 Settings Menu Chart 6 4 1 Base Unit 14 ...
Page 15: ...6 4 2 Handset 6 5 PIN Code 6 5 1 Base Unit 15 ...
Page 25: ...Answering System 25 ...
Page 29: ...29 ...
Page 30: ...8 4 2 Entering Names Characters 30 ...
Page 31: ...Cross Reference Phonebook Character Table 8 4 3 Phonebook Character Table 31 ...
Page 32: ...8 4 4 Storing the Number in the Handset Phonebook 32 ...
Page 33: ...8 4 5 Hot Keys Speed Dial 33 ...
Page 35: ...8 5 Handset Registration to a Base Unit 35 ...
Page 36: ...Note for Service At step 7 enter Finally Handset will be linked to Base Unit 36 ...
Page 37: ...8 6 Base Unit Selection 37 ...
Page 44: ...44 ...
Page 45: ...Cross Reference 11 3 2 Handset 45 ...
Page 67: ...2 Put the probes at the receiver terminals as shown below 67 ...
Page 74: ...26 CPU DATA BASE UNIT 26 1 IC2 BBIC 74 ...
Page 95: ...95 ...
Page 97: ...34 ACCESSORIES AND PACKING MATERIALS 97 ...
Page 98: ...34 1 KX TCD510ALV 34 2 KX TCA151AZV 98 ...
Page 99: ...35 TERMINAL GUIDE OF THE ICs TRANSISTORS AND DIODES 35 1 Base Unit 99 ...
Page 115: ...PbF R1 R2 TP4 TP1 TP2 TP3 Digital Volt Meter 12Ω 2W A DC Power Supply 6V ...
Page 130: ...PbF D1 J1 CIRCUIT BOARD CHARGER UNIT Component View ...
Page 131: ...PbF R1 R2 TP4 TP1 TP2 TP3 CIRCUIT BOARD CHARGER UNIT Flow Solder Side View ...
Page 134: ...IC3 IC2 IC1 IC10 PbF Marked ...
Page 136: ...PbF D1 J1 Marked PbF R1 R2 TP4 TP1 TP2 TP3 Marked Component View Flow Solder Side View ...