18
concrete. Suitable fasteners must be used for other structures (e.g. plasterboard, porous con-
crete, porous bricks)
K1 WALL COOKER HOOD ASSEMBLY INSTRUCTIONS
Phase 1
(Fig. A)
1) Place the support bar (S) on the wall at a height H from hob resulting from the sum of the
quotas:
- X + Y + 320 mm, where X=650 mm and Y is the height of the cooker hood cone.
2) With a spirit level, verify the horizontal alignment;
3) mark 2 drilling points at the ends of support bar.
4) Drill, insert 2 ø 8mm wall plugs and fasten the support bar (S) with the relative screws (V1).
(Fig. B)
1) Hook the hood on the support bar (S).
2) Adjust the alignment of the hood, using the fi xing screws.
- The upper screw (B) adjusts the distance from the wall, the lower one (C) the vertical scroll-
ing.
3) To prevent the hood from falling due to a pressure below, fasten it to the wall with 2 ø 6mm
wall plugs and relative screws (V2) using the appropriate holes on the back of the hood.
Phase 2
- Remove the perimeter suction panel and metallic fi lters as described in sec. H.
- Suction version (SUCTION MODE): install the return valve (M) as described in Fig. H2, and
then, connect the outlet fi tting of the fan to the external discharge through suitable piping.
- Filtering version (RECIRCULATION MODE): assemble the charcoal fi lters as described in
sec. H.
- Carry out the electric connection only after having disconnected the electric power supply
of the hood as described in sec. D.
Phase 3
(Fig. C)
1) Insert the extension (H) in the chimney (G).
2) Fasten it all (G+H) to the hood body using the screws (V5).
3) Slide the extension (H) until it reaches the desired height.
4) Place the bracket (L) on the wall, verify the horizontal alignment with a spirit level and mark
2 drilling points at the ends.
5) Drill, insert 2 ø 6mm wall plugs and fasten the bracket (L) with the relative screws (V6).
6) Screw the extension (H) to the bracket (L) using the two screws (V7).
- Reassemble the perimeter suction panel and metallic fi lters as described in sec. H.
- Power the hood complying with the regulations in force (see sec. D of the booklet).
K2 ISLAND COOKER HOOD ASSEMBLY INSTRUCTIONS
Phase 1
(Fig. A1)
1) Identify the height H of the hob resulting from the sum of the quotas:
X + Y + H1 (X normally is equal to 65cm)
2) Scroll trellises (C) and (C1) until reaching the desired height (H),
3) Then block them using 8 self-threading screws (V1).
4) Fasten the trellis (C) to the ceiling with 4 Ø 8mm wall plugs and relative screws (V2) using the
appropriate holes on the ceiling.
Phase 2
(Fig. B1)
1) Introduce the extension (E) onto the chimney (D) and block them together using the adhe-