16
Installation
11. Installation
11.1 Installation environment
The product is not intended for continuous exposure to direct sunlight. There is a risk that the product
might be overheating.
The product is not intended for installation in contact with corrosive chemical compounds. Check the
resistance of the front panel film to a specific compound before installation.
Do not use tools of any kind (screwdrivers, etc.) to operate the touch screen of the product.
In order to meet the front panel protection classifications, proper installation procedure must be
followed:
•
The borders of the cutout must be flat.
•
Each fixing screw must be tightened until the plastic bezel corner get in contact with the panel.
•
The cutout for the panel must be of the dimensions indicated in this manual.
IP66 is guaranteed only if:
•
The max. deviation from the plane surface to the cutout is ≤0.5mm.
•
The thickness of the case where the product is mounted is from 1.5mm to 6mm.
•
The max. surface roughness where the gasket is applied is ≤120μm.
(1)
(2)
(1) HMX700 series touch terminal
(2) Installation cutout