5
3.2.
After reparing
1. Confirm the smooth and normal operation when switching ON.
2. Confirm if the charging status lamp is lit when connecting the main unit with charger.
3. Confirm if the water-proof rubber is assembled without any pinching.
4. Confirm if there is no abnormal sound.
NOTE:
1. When the rechargeable battery is replaced, charge the main unit onto charger. The main PCB may not operate until the
charging current flows.
2. The charge status lamp may not be lid if the battery is completely discharged.
3. If the main unit set on the charger with switching ON, the operation stops and start charging.
4. The battery capacity lamp may blink if the switch turns ON after replacing the battery. It is not failure. The charge status lamp
will turn off when charging is completed.