Vacuum drying
After completing the piping connection, execute vacuum drying for the connecting piping and the indoor unit.
The vacuum drying must be carried out by using the service ports of both the liquid and gas side valves.
CAUTION
Use two wrenches and tighten with regular torque.
Flare nut fastening torque N•m (kgf•cm)
ø6.35 mm
18 (180)
ø12.7 mm
55 (560)
ø19.05 mm
100 (1020)
ø9.52 mm
42 (430)
ø15.88 mm
65 (660)
Liquid side piping
Gas side piping
ø6.35 mm (1/4")
ø12.7 mm (1/2")
11.1.4 Indoor Unit Drain Piping
During drain piping connection, be careful not to exert extra force on the drain port at the indoor unit.
The outside diameter of the drain connection at the indoor unit is 32 mm.
Piping material: Polyvinyl chloride pipe VP-25 and pipe fittings.
Be sure to perform heat insulation on the drain piping.
Heat insulation material: Polyethylene foam with thickness more than 8 mm (local supply).
Drain piping must have down-slope (1/50 to 1/100); be sure not to provide up-and-down slope to prevent reversal
flow.
Be sure to check no air trap on drain hose and to ensure smooth water flow and no abnormal sound.
The height of drain may be possible up to
750 mm.
When drain set piping, install as shown in the
figure below.
Drain Test
The air conditioner uses a drain up motor to drain water. Use the following procedure to test the drain
up motor operation.
Connect the main drain pipe to exterior and leave it provisionally until the test comes to an end.
Feed water to the flexible drain hose and check the piping for leakage.
Be sure to check the drain up motor for normal operating and noise when electric wiring is complete.
When the test is complete, connect the flexible drain hose to the drain port.
Pour about 600-700cc of water in the drain pan of the indoor unit. (Pour from the position specified in the drawing
by using a water supply bottle or other suitable tool.)
Press the drain pump test run on pcb to start the drain motor, and verify water drainage.
(The drain motor will automatically stop after operating for about five minutes.)
Summary of Contents for CS-E9PB4EA
Page 24: ...24 4 Location of Controls and Components 4 1 Indoor Unit 4 2 Outdoor Unit 4 3 Remote Control...
Page 25: ...25 5 Dimensions 5 1 Indoor Unit...
Page 26: ...26 5 2 Outdoor Unit 5 2 1 CU E9PB4EA 5 2 2 CU E12PB4EA...
Page 27: ...27 6 Refrigeration Cycle Diagram 6 1 CS E9PB4EA CU E9PB4EA...
Page 28: ...28 6 2 CS E12PB4EA CU E12PB4EA...
Page 29: ...29 7 Block Diagram 7 1 CS E9PB4EA CU E9PB4EA...
Page 30: ...30 7 2 CS E12PB4EA CU E12PB4EA...
Page 31: ...31 8 Wiring Connection Diagram 8 1 Indoor Unit...
Page 34: ...34 9 Electronic Circuit Diagram 9 1 Indoor Unit...
Page 35: ...35 9 2 Outdoor Unit 9 2 1 CU E9PB4EA...
Page 36: ...36 9 2 2 CU E12PB4EA...
Page 37: ...37 10 Printed Circuit Board 10 1 Indoor Unit 10 1 1 Main Printed Circuit Board...
Page 38: ...38 10 1 2 Display Printed Circuit Board...
Page 39: ...39 10 2 Outdoor Unit 10 2 1 CU E9PB4EA...
Page 40: ...40 10 2 2 CU E12PB4EA...
Page 65: ...65 14 3 2 CU E12PB4EA...
Page 106: ...106 18 Exploded View and Replacement Parts List 18 1 Indoor Unit...