
Chapter 4. Trunks and Lines
Section 300-Installation
4-30
DBS Manual - Revised April 2000
DBS-2.3/9.2-300
Figure 4-12. Clock sync cable and sync cable connections, double-cabinet installation
C onnector
M FR
1
CBL
(S)
Interconnection
C ables
CBL
(M )
SCC
CPC
TRK1 TRK2 TRK3 EC1 EC2 EC3 EC4 EC5 EC6 EC7 EC8 EC/TRK SCC CPC AUX1 AUX2
TRK
DEC
DEC
DEC
DEC
DEC
DEC
DEC
DEC
M FR
2
G uide
Slot Label
C onnector
N
O
T
U
S
E
D
TRK1 TRK2 TRK3 EC1 EC2 EC3 EC4 EC5 EC6 EC7 EC8 EC/TRK SCC CPC AUX1 AUX2
TRK
DEC
DEC
DEC
DEC
DEC
DEC
DEC
DEC
T-1
TRK
T1
TRK
G uide
Slot Label
(VB -43564)
C lock Sync.
C able
M aster C abinet
S lave C abinet
C ard
Label
C ard
Label
T-1 M D F
T-1 M D F
Sync.Unit
C N 5
C N 4
C N 1
C N 5
N
O
T
U
S
E
D
Sync
Cable
Note:The num berofanalog trunks thatcan be
installed depends on how m any T1 channels are
used.
Summary of Contents for CPC-EX
Page 12: ...About This Manual Section 300 Installation xii DBS Manual Revised April 2000 DBS 2 3 9 2 300 ...
Page 20: ...2 2 DBS Manual Revised April 2000 DBS 2 3 9 2 300 ...
Page 30: ...3 2 DBS Manual Revised April 2000 DBS 2 3 9 2 300 ...
Page 50: ...4 2 DBS Manual Revised April 2000 DBS 2 3 9 2 300 ...
Page 94: ......
Page 96: ...5 2 DBS Manual Revised April 2000 DBS 2 3 9 2 300 ...
Page 132: ...6 2 DBS Manual Revised April 2000 DBS 2 3 9 2 300 ...
Page 144: ...7 2 DBS Manual Revised April 2000 DBS 2 3 9 2 300 ...
Page 204: ...Index Section 300 Installation Index 8 DBS Manual Revised April 2000 DBS 2 3 9 2 300 ...