
70
0-2
ANT PWB
FFC
0-1
0-2
0-2
0-2
0-4
3 2
Safety work
Safety work
Convex Cabi in
the under part
Convex Cabi in
the under part
Boss
externals
The Rib of Cabi in the under
is passed and the concave
part is passed
Line Hold Sheet is affixed
with ANT PWB arranged
at the figure below position
FIG1 W LAN
for being
Line Hold Sheet
Driv Emi Sheet Affixes Driv
Emi Sheet
Affixes Line
Hold Sheet
The cable is processed under
the main substrate too much
thing which does not run aground
in convex part in cabi in the under
In the cabi in the under, affixes with
the two sided tape prepared for FFC
with the position of a red line decided
with the treatment device
The thing that FFC does not
run aground in the boss of the
cabi in the under is confirmed
Do not run aground
in the cable to the
convex part heaven
side
The bent habit is
put on the cable
After Line Hold Sheet is affixed, the
cable is processed without loosening
affixes Driv Emi Sheet
0-0.2
0-1
The part product number
depends on last page
affixes
Line Hold Cushion
It is the same as last page excluding
the undermentioned specification
ANT CABLE is processed
under the cushion
Summary of Contents for CF-Y5LWVYZ1 TOUGHBOOK
Page 4: ...4 ...
Page 5: ...5 ...
Page 13: ...13 4 Diagnosis Procedure 4 1 Basic Procedures ...
Page 39: ...39 9 3 2 7 Assembly of the Hinge L R 9 3 2 8 Putting LCD Rear Cushion LCD Side Cushion ...
Page 40: ...40 9 3 2 9 Assembly of the LCD Rear LCD Front 9 3 2 10 Assembly of the Hinge Cover L R ...
Page 47: ...47 9 3 4 Assembly knowhow of the Top Case 9 3 4 1 Assembly of the Disk Cover ...
Page 59: ...59 9 3 4 13 Wiring Speaker Cable ...
Page 62: ...62 ...