Wiring
KW2M-A/X User's Manual
13
4.4 Wiring Diagrams
Please connect a breaker or a fuse to the power supply and voltage input part for safety reasons and to
protect the device.
・
Recommended breaker: 3 to 15A (IEC approved or UL Listed)
・
Recommended fuse: Time-lag fuse rated current 2A (IEC approved or UL Listed)
Grounding the secondary side of VT (voltage transformer) and CT (current transformer) is not necessary
with a low-voltage circuit.
*When using several CTs, set each CT approximately 1m apart. If the two CTs are set too close each
other, the device may not measure accurately due to magnetic field interferences.
◆
When measuring a load with rated input voltage
Single-phase two-wire system
*One CT is needed to measure a single-phase two-wire system.
*2 CTs are needed to measure 2-circuit and 3 CTs are needed to measure 3-circuit.
*To measure 2-circuit, wire 1 and 3. To measure 3-circuit, wire 1 and 3 and 5.
Single-phase three-wire/Three-phase three-wire
*2 CTs are needed to measure single-phase three-wire system, three-phase three-wire system.
*4 CTs are needed to measure 2-circuit.