
5
POWER CYCLE AND OUTLET SEQUENCING
The outlet banks of the SM3-PRO are configured to turn on and off in a pro-
grammed sequence where each outlet bank has a set of programmed delay
times.
Outlet Bank
Power Cycle Delay
Turn On Delay
Turn Off Delay
1 5
seconds
0
seconds
10
seconds
2 10
seconds 0
seconds
10
seconds
Power Cycle Delay:
When a Power Cycle is initiated, the outlet bank will immediately turn off and then turn back on after the
Power Cycle Delay
time
Turn On Delay:
When a Turn On Sequence is initiated, the outlet bank will turn ON after the
Turn On Delay
time.
Turn Off Delay:
When a Turn Off Sequence is initiated, the outlet bank will turn OFF after the
Turn Off Delay
time.
The delay times are pre-programmed but may be changed on the BlueBOLT web
site or by issuing the <set> command to the Ethernet port (see the Advanced
Operation section for details). The default configuration is:
SM3-PRO Specifications
Specifications subject to change due to product upgrades and improvements.
AC POWER
Operating
Voltage
120
Vac
/
60Hz
Current
Capacity
15
A
UL 1449 Voltage Protection Rating
330V L-N, 400V L-G, 400V N-G
UL
1449
Nominal
Discharge
Current
3,000A
Initial
Clamping
Level
200V
Energy
Dissipation
1,575
Joules
(8/20µs)
Overvoltage
shutoff
134
Vac
±
2
Vac
Undervoltage
shutoff
95
Vac
±
2
Vac
EMI
/
RFI
Noise
Filtration
-18.7dB
@
10kHz
-50.5dB
@
100kHz
-43.9dB
@
1MHz