Installation manual 

 

 
 

 

Door and window 

Doorframe: 

¾

 If it is a double door, the 

doorframe is supplied in 
separate parts due to 
transportation requirements and 
you will have to begin by 
assembling it.  

¾

  To do this, place together the 4 

parts of the frame and screw 
them onto one another.  

¾

  Make sure that the part of the 

frame with the deeper notch is 
installed upwards. The lateral 
jamb parts have hinges and are 
mirrored.  

¾

  It is recommended to install the 

leaves later.  

¾

  If it is a single door, its frame and 

leaf are supplied already 
assembled. 

 Doorframe installation (Only necessary for a double door!): 

 

 

 

Door installation: 

The doorframe is placed at the 
formed aperture and pushed with 
force onto the lower log. If it is a 
double door, place the leaves on the 
hinges now. To open and close the 
door, fit the separately packaged lock 
and handle.  

 

 

 

Window installation: 

Continue with the installation of the wall logs until you reach the window height. The wall plans (see 
Technical specifications) show how many logs go under the window. Install the window similarly with 
the door. Just like the door, push the window frame with the window into the window aperture onto the 
lower log, applying force. Make sure that the window is not fitted backwards (topsy-turvy).  

ADVICE

: Definitely make sure that the windows and doors open in the proper direction. The doors 

always open from the inside 

to the outside

. The revolving-tilting windows open 

to the inside

. The 

revolving and the slinging windows open 

to the outside

 (the window handles are on the inside). 

ATTENTION

: It is not necessary to fix the doors and windows to the wall logs! If you wish to do this, it 

will be sufficient to fix them with a couple of screws in the lower part of the frame because as they dry, 
the wall logs will begin subsiding.  

You can conduct the final adjustments of the doors and windows only some 2-3 weeks after the house 
installation, when the house will have become adapted to weather conditions and its logs settled.  

Summary of Contents for PAJ28-3030-1

Page 1: ...fettosi gi montati o verniciati sono esclusi dal diritto alla sostituzione Ogni altro diritto resta escluso In caso di reclamazione procedere nel modo seguente presentare questo certificato di control...

Page 2: ...ers adresse Ostajan osoite K parens adress Telephone Telefoon Telefon T l phone Tel fono Telefon Telefon nr Puhelin Telefon Forwarder Pick up Others Door Verzending Zelf Afhalen Spedition Selbstabhole...

Page 3: ...iche tecniche al prodotto Reservado el derecho a modificaciones t cnicas Installation manual Montageanleitung Notice de montage Istruzioni per il montaggio Manual de montaje Log cabin PAJ28 3030 1 Blo...

Page 4: ...f the house We can only review complaints if you submit the control number of the house to the seller The warranty does not cover Peculiarities of wood as a natural material Wooden details already pai...

Page 5: ...windows with a wood impregnation agent and do that namely both inside and outside Otherwise the doors and windows can become twisted After the house assembly is completed we recommend for the conclusi...

Page 6: ...same time make sure that there are sufficient air apertures under the house floor for ventilation We recommend the following foundation options Strip or spot foundation Foundation from concrete or pa...

Page 7: ...CE To ensure protection from wind and storm it is recommended to attach the foundation joists to the foundation for this you can use for instance metal angles anchors etc The corresponding materials a...

Page 8: ...logs are always assembled with their tongue upwards If necessary use the hitting block and hammer Never directly hit the tongue with the hammer Install the walls in accordance with the appended wall p...

Page 9: ...the wall logs until you reach the window height The wall plans see Technical specifications show how many logs go under the window Install the window similarly with the door Just like the door push th...

Page 10: ...w place the pos PR2 and PR3 from the top to the purlin and from the bottom to the upper wall log Fixate the U Profile boards between the purlins and on the walls Start placing the roof boards with the...

Page 11: ...d adjust the attachments so the wall logs can settle Installation of storm braces General advice Problem Gaps appear between the wall logs Cause Additional details are attached to the house that do no...

Page 12: ......

Page 13: ......

Page 14: ......

Page 15: ......

Page 16: ......

Page 17: ......

Page 18: ......

Page 19: ......

Page 20: ......

Page 21: ......

Page 22: ......

Page 23: ......

Reviews: