background image

Installation manual 

 

 
 

 

 Garden house painting and maintenance 

Wood is a natural material, growing and adapting depending on weather conditions. Large and small 
cracks, colour tone differences and changes, as well as a changing structure of wood are not errors, 
but a result of wood growing and a peculiarity of wood as a natural material.  
 
Unprocessed wood (except for foundation joists) becomes greyish after having been left untouched for 
a while, and can be turn blue and become mouldy. To protect the wooden details of your garden 
house, you must immediately process them with a wood preservative.  
 
We recommend that you cover the floor boards in advance with a colourless wood impregnation 
agent, especially the bottom sides of the boards, to which you will no longer have access when the 
house is assembled. Only this will prevent moisture penetration. 

 

We definitely recommend that you also process the doors and windows with a wood impregnation 
agent, and do that namely both inside and outside! Otherwise the doors and windows can become 
twisted.  

After the house assembly is completed, we recommend for the conclusive finishing a weather 
protection paint that will protect wood from moisture and UV radiation.  

When painting, use high quality tools and paints, follow the paint application manual and 
manufacturer’s safety and usage instructions. Never paint a surface in strong sunlight or rainy 
weather. Consult a specialist regarding paints suitable for unprocessed softwood and follow the paint 
manufacturer’s instructions.  

Having been properly painted, your garden house’s lifetime will increase substantially. We recommend 
that you inspect the house thoroughly once every six months.  

 

2  Preparation for assembly 

 

Tools and preparation of components 

To assemble the garden house, you will need the following tools: 

 assembly aid 

 water-level 

 

knife 

 

 

ladder 

 screwdriver 

 measuring tape 

  

 

 hammer  

 

saw 

 pliers 

 drill

 

 

ADVICE:

 To avoid splinters, we recommend that you wear the corresponding protective gloves during 

the assembly process. 

 

Summary of Contents for PAJ28-3030-1

Page 1: ...fettosi gi montati o verniciati sono esclusi dal diritto alla sostituzione Ogni altro diritto resta escluso In caso di reclamazione procedere nel modo seguente presentare questo certificato di control...

Page 2: ...ers adresse Ostajan osoite K parens adress Telephone Telefoon Telefon T l phone Tel fono Telefon Telefon nr Puhelin Telefon Forwarder Pick up Others Door Verzending Zelf Afhalen Spedition Selbstabhole...

Page 3: ...iche tecniche al prodotto Reservado el derecho a modificaciones t cnicas Installation manual Montageanleitung Notice de montage Istruzioni per il montaggio Manual de montaje Log cabin PAJ28 3030 1 Blo...

Page 4: ...f the house We can only review complaints if you submit the control number of the house to the seller The warranty does not cover Peculiarities of wood as a natural material Wooden details already pai...

Page 5: ...windows with a wood impregnation agent and do that namely both inside and outside Otherwise the doors and windows can become twisted After the house assembly is completed we recommend for the conclusi...

Page 6: ...same time make sure that there are sufficient air apertures under the house floor for ventilation We recommend the following foundation options Strip or spot foundation Foundation from concrete or pa...

Page 7: ...CE To ensure protection from wind and storm it is recommended to attach the foundation joists to the foundation for this you can use for instance metal angles anchors etc The corresponding materials a...

Page 8: ...logs are always assembled with their tongue upwards If necessary use the hitting block and hammer Never directly hit the tongue with the hammer Install the walls in accordance with the appended wall p...

Page 9: ...the wall logs until you reach the window height The wall plans see Technical specifications show how many logs go under the window Install the window similarly with the door Just like the door push th...

Page 10: ...w place the pos PR2 and PR3 from the top to the purlin and from the bottom to the upper wall log Fixate the U Profile boards between the purlins and on the walls Start placing the roof boards with the...

Page 11: ...d adjust the attachments so the wall logs can settle Installation of storm braces General advice Problem Gaps appear between the wall logs Cause Additional details are attached to the house that do no...

Page 12: ......

Page 13: ......

Page 14: ......

Page 15: ......

Page 16: ......

Page 17: ......

Page 18: ......

Page 19: ......

Page 20: ......

Page 21: ......

Page 22: ......

Page 23: ......

Reviews: