Installation manual 

 

 
 

 

Door and window 

  If  it  is  a  double d oor, th e 

doorframe i

s s

upplied i

separate par

ts d

ue t

transportation r equirements and  

you  will ha ve t o beg in b y 

assembling it.  

Doorframe: 

  To do t his, p lace t ogether t he 4  

parts o f t he f rame and s crew 

them onto one another.  

  Make s ure t hat t he p art  of t he 

frame w ith  the  deeper n otch i s 

installed  upwards.  The  lateral 

jamb par ts hav e  hinges a nd ar e 

mirrored.  

  It i s r ecommended t o i nstall t he 

leaves later.  

  If it is a single door, its frame and 

leaf ar e s upplied al ready 

assembled. 

 Doorframe installation (Only necessary for a double door!): 

 

 

The door frame i s pl aced  at t he 

formed aper ture a nd p ushed  with 

force  onto  the  lower  log.  If  it  is  a 

double door, place the leaves on the 

hinges no w. T o ope n an d c lose t he 

door, fit the separately packaged lock 

and handle.  

Door installation: 

 

 

 

Continue with the installation of the wall logs until you reach the window height. The wall plans (see 

Technical specifications) show how many logs go under the window. Install the window similarly with 

the door. Just like the door, push the window frame with the window into the window aperture onto the 

lower log, applying force. Make sure that the window is not fitted backwards (topsy-turvy).  

Window installation: 

ADVICE

:  Definitely m ake sure that the  windows an d door s o pen i n the pr oper  direction. T he  doors 

always open from the inside 

to the outside

. T he r evolving-tilting windows open 

to the inside

. The 

revolving and the slinging windows open 

to the outside

 (the window handles are on the inside). 

ATTENTION

: It is not necessary to fix the doors and windows to the wall logs! If you wish to do this, it 

will be sufficient to fix them with a couple of screws in the lower part of the frame because as they dry, 

the wall logs will begin subsiding.  
You can conduct the final adjustments of the doors and windows only some 2-3 weeks after the house 

installation, when the house will have become adapted to weather conditions and its logs settled.  

www.simplylogcabins.co.uk

Summary of Contents for Helena 18.6m2

Page 1: ...Gudrum Buckingham 1 Assembly Instructions w w w s i m p l y l o g c a b i n s c o u k...

Page 2: ...tout change Toutes les revendications ult rieures sont exclues Si une r clamation avait lieu veuillez respecter le d roulement suivant Il vous faudra pr senter v otre commer ant sp cialis ce bulletin...

Page 3: ...___________________________________________ P dansk Kontrol Certifikat Opbevares sikkert Dansk Det k bte hus er fremstillet i overensstemmelse med de h je kvalitets krav Produktet er blevet omhyggelig...

Page 4: ...ved produktet Alle rechten en technische wijzigingen voorbehouden Installation manual Montageanleitung Notice de montage Istruzioni per il montaggio Manual de montaje Monteringsanvisning Installatieg...

Page 5: ...iew complaints if you submit the control number of the house to the seller Peculiarities of wood as a natural material The warranty does not cover Wooden details already painted processed with a wood...

Page 6: ...ation agent and do that namely both inside and outside Otherwise the doors and windows can become twisted After the house assembly is completed we recommend for the conclusive finishing a weather prot...

Page 7: ...ake sure that there are sufficient air apertures under the house floor for ventilation We recommend the following foundation options Strip or spot foundation Foundation from concrete or pavement slabs...

Page 8: ...are always assembled with their tongue upwards If necessary use the hitting block and hammer Never directly hit the tongue with the hammer Install the walls in accordance with the appended wall plans...

Page 9: ...il you reach the window height The wall plans see Technical specifications show how many logs go under the window Install the window similarly with the door Just like the door push the window frame wi...

Page 10: ...e apex or sidewall log somewhat lower Roof Before installing the roof boards make sure that the house is completely level Use the water level to check all walls ATTENTION When placing the roof use a s...

Page 11: ...cm NB Some house options do not include it in the kit Having installed the roof cover material attach the wind braces to the roof and the facia boards to the rafters and upper wall logs Installation...

Page 12: ...ews tightly so wood can further swell or diminish With the house having settled you should adjust the attachments so the wall logs can settle Installation of storm braces General advice Problem Gaps a...

Page 13: ...w w w s i m p l y l o g c a b i n s c o u k...

Page 14: ...w w w s i m p l y l o g c a b i n s c o u k...

Page 15: ...70 846 2 A C B B Side slat Randleiste Baguette en bordure Pos mm mm mm pcs Sis A 19 95 986 2 Sis B 19 70 1072 4 Sis C 19 70 846 2 A C B B Side slat Randleiste Baguette en bordure Pos mm mm mm pcs Sis...

Page 16: ...w w w s i m p l y l o g c a b i n s c o u k...

Page 17: ...w w w s i m p l y l o g c a b i n s c o u k...

Page 18: ...w w w s i m p l y l o g c a b i n s c o u k...

Page 19: ...w w w s i m p l y l o g c a b i n s c o u k...

Page 20: ...w w w s i m p l y l o g c a b i n s c o u k...

Page 21: ...w w w s i m p l y l o g c a b i n s c o u k...

Page 22: ...w w w s i m p l y l o g c a b i n s c o u k...

Page 23: ...w w w s i m p l y l o g c a b i n s c o u k...

Reviews: