Base frame 

(Foundation joists) 

The base frame of the house must be completely flat and level to ensure that the installation proceeds 

without problems. 

ATTENTION: d ifferent h ouse c an h ave d ifferent fo undation p lacements  –  see t he ap pended 

base frame drawing (in Technical specifications)! 

Place the impregnated foundation joists on the prepared foundation in accordance with the drawing at 

equal intervals. Make sure that the joists are level and rectangular prior to screwing them together.  

ADVICE

: I t i s r ecommended t o p lace  between t he  foundation j oists  and f oundation  a d amp-proof 

course that will protect the house from moisture and decay.  

ADVICE

: To ensure protection from wind and storm, it is recommended to attach the foundation joists 

to the foundation (for this, you can use for instance metal angles, anchors, etc.). The corresponding 

materials are not included in the supplied kit! 
Installation of foundation joists: 

 

 

Walls 

When installing the walls, it is important to remember that: 

  The logs are always assembled with their tongue upwards! 

  If necessary, use the hitting block and hammer! Never directly hit the tongue with the hammer! 

Install the walls in accordance with the appended wall plans (see Technical specifications). 

First of  al l p lace  half  logs of   front and b ack w all  at t he 

correct  location  and  attach  them  with  screws  to  the 

foundation joists. Then install the side wall logs. Make sure 

that the first layer of logs extends a  bit over the foundation 

joists: the logs must extend over the joists by some 3-5 mm. 

You will thus protect the house from moisture, allowing the 

free flow of rainwater into the ground.  
 

ATTENTION

After  the  first  layer  of  logs,  measure  the 

diagonal lengths and, if necessary, re-install the logs. Only if 

the diagonal lengths are completely equal is the base frame 

rectangular and you can mutually attach the logs.  

         

 

            

 

The first layer of logs: 

 

Continue the installation of the walls by strongly forcing the wall logs into one another. If necessary, 

use the hitting block and hammer. At the same time, do not forget to begin the installation of the door 

and windows. You should definitely begin the door installation after the 5

th

-6

th

 layer of logs. 

www.simplylogcabins.co.uk

Summary of Contents for Helena 18.6m2

Page 1: ...Gudrum Buckingham 1 Assembly Instructions w w w s i m p l y l o g c a b i n s c o u k...

Page 2: ...tout change Toutes les revendications ult rieures sont exclues Si une r clamation avait lieu veuillez respecter le d roulement suivant Il vous faudra pr senter v otre commer ant sp cialis ce bulletin...

Page 3: ...___________________________________________ P dansk Kontrol Certifikat Opbevares sikkert Dansk Det k bte hus er fremstillet i overensstemmelse med de h je kvalitets krav Produktet er blevet omhyggelig...

Page 4: ...ved produktet Alle rechten en technische wijzigingen voorbehouden Installation manual Montageanleitung Notice de montage Istruzioni per il montaggio Manual de montaje Monteringsanvisning Installatieg...

Page 5: ...iew complaints if you submit the control number of the house to the seller Peculiarities of wood as a natural material The warranty does not cover Wooden details already painted processed with a wood...

Page 6: ...ation agent and do that namely both inside and outside Otherwise the doors and windows can become twisted After the house assembly is completed we recommend for the conclusive finishing a weather prot...

Page 7: ...ake sure that there are sufficient air apertures under the house floor for ventilation We recommend the following foundation options Strip or spot foundation Foundation from concrete or pavement slabs...

Page 8: ...are always assembled with their tongue upwards If necessary use the hitting block and hammer Never directly hit the tongue with the hammer Install the walls in accordance with the appended wall plans...

Page 9: ...il you reach the window height The wall plans see Technical specifications show how many logs go under the window Install the window similarly with the door Just like the door push the window frame wi...

Page 10: ...e apex or sidewall log somewhat lower Roof Before installing the roof boards make sure that the house is completely level Use the water level to check all walls ATTENTION When placing the roof use a s...

Page 11: ...cm NB Some house options do not include it in the kit Having installed the roof cover material attach the wind braces to the roof and the facia boards to the rafters and upper wall logs Installation...

Page 12: ...ews tightly so wood can further swell or diminish With the house having settled you should adjust the attachments so the wall logs can settle Installation of storm braces General advice Problem Gaps a...

Page 13: ...w w w s i m p l y l o g c a b i n s c o u k...

Page 14: ...w w w s i m p l y l o g c a b i n s c o u k...

Page 15: ...70 846 2 A C B B Side slat Randleiste Baguette en bordure Pos mm mm mm pcs Sis A 19 95 986 2 Sis B 19 70 1072 4 Sis C 19 70 846 2 A C B B Side slat Randleiste Baguette en bordure Pos mm mm mm pcs Sis...

Page 16: ...w w w s i m p l y l o g c a b i n s c o u k...

Page 17: ...w w w s i m p l y l o g c a b i n s c o u k...

Page 18: ...w w w s i m p l y l o g c a b i n s c o u k...

Page 19: ...w w w s i m p l y l o g c a b i n s c o u k...

Page 20: ...w w w s i m p l y l o g c a b i n s c o u k...

Page 21: ...w w w s i m p l y l o g c a b i n s c o u k...

Page 22: ...w w w s i m p l y l o g c a b i n s c o u k...

Page 23: ...w w w s i m p l y l o g c a b i n s c o u k...

Reviews: