6
PALM
®
MicroBeam User Manual - 0202 Z
Installation
2 Installation
Your PALM
®
MicroBeam is only to be installed by
Palm service engineers or their representatives. In
case you want to move an already installed unit
please contact P.A.L.M. Microlaser Technologies
for assistance.
The PALM
®
Laser Systems basically are mainte-
nance-free. Necessary service actions are the
exchange of the laser cartridge which has a garan-
teed lifetime of two years or 20·10
6
pulses.
In case of any malfunction of the device, please con-
tact the PALM
®
Service (see section 1.3, page 5).
3 Operating Room
In order to guarantee a correct function and com-
fortable work with your new PALM
®
MicroBeam
System, the following requirements has to be paid
attention:
- The system should be installed in a room, which
is adequately large (about 6 square meters)
and well aired.
- There should be a free space available about
90cm above the table and all shelves, wall cup-
boards etc. should be removed
Figure 1
Dimensions
- Nature of the floor: vibration free (if not, spe-
cial working table recommended) and even
- Load carrying capacity for steel or granite
table: < 400 kg
- Minimum space needed in total: for steel or
granite table about 140 x 90 cm or for the alu-
minum plate a table measuring at least 120 x
90 cm on which the system will be set up and
with a load carrying capacity of 90 kg.
- Power supply: 115/230VAC / 16VA safety fuse
3.1 Admissible Ambient Conditions
The divice may be operated at the following ambi-
ent conditions:
- Ambient Temperature of the air:
+15°C to +25°C
- Air humidity: 30% to 80%, not condensing.
Notice
Please consider also vibrations raising from
your routine lab equipmemt!
P.A.L.M.
Microlaser Technologies